FIELD: concrete or concrete-like piles cast in position, particularly short piles made of filler material.
SUBSTANCE: method involves forming well in ground; partial filling well with filler material in successive layers; compacting some of layers one after another during laying thereof into well; applying load to all pile layers; forming pile; loading ready pile by applying load of pile body comprising loading member to outer top layer for at least partially irreversible pile compression and at least partially irreversible compaction of substantial part of ground around pile.
EFFECT: increased strength, improved load-bearing capacity of ground near short pile, reduced cost and enhanced pile structure.
32 cl, 47 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO STRENGTHEN LOOSE NATURAL BASE FOR ERECTION OF ROAD EARTH BED | 2010 |
|
RU2449075C1 |
DEVICE AND METHOD OF MAKING BUILDING BEARING PILES FROM ONE OR SUCCESSIVE LAYERS FORMED IN GROUND ROCK | 2004 |
|
RU2369690C2 |
"KVASHA" PILE AND METHOD FOR DEEPENING IN SOIL | 1991 |
|
RU2047689C1 |
ERECTION METHOD OF PILE OF SHALLOW EMBEDDING | 2012 |
|
RU2510441C1 |
METHOD TO ERECT FOUNDATION | 2010 |
|
RU2420628C1 |
METHOD OF PILE DRIVE DEVICE | 2014 |
|
RU2601630C2 |
METHOD OF DRILLED PILE MANUFACTURING | 2009 |
|
RU2389849C1 |
METHOD FOR REDUCTION OF DEFORMATIONS OF MOTOR AND RAILWAY ROADS ON PERMAFROST SOILS THAT THAW OUT IN PROCESS OF OPERATION | 2013 |
|
RU2536538C1 |
DRILLING-AND-DRIVING METHOD FOR PILE FOUNDATION ERECTION IN PERMAFROST GROUND | 2006 |
|
RU2320821C1 |
DRIVE PILE DEVICE IN PUNCHED WELL WITH WIDER BASE | 2014 |
|
RU2582530C2 |
Authors
Dates
2004-07-20—Published
2000-01-25—Filed