FIELD: forms, shutterings or falsework for making walls, floors, ceilings or roofs, particularly centering for transport, civil and industrial engineering.
SUBSTANCE: modular centering includes several inventory units formed as polyhedrons with rectangular bases. Two opposite sides of bases having hinged jointing members are connected with braces. Two another ends of bases are coupled in pairs one to another and with one end of retention axle arranged at polyhedron vertex. Bases of adjacent units extend at given angles and are connected one with another by hinged jointing members. Vertexes of adjacent units are secured one to another by length-adjustable means.
EFFECT: increased reusability, reduced material consumption, decreased centering mounting time, reduced labor consumption of building works.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTION OF SHELLS ON PNEUMATIC FALSEWORK | 1994 |
|
RU2112120C1 |
METHOD TO ERECT CROSS VAULT | 2008 |
|
RU2419708C2 |
PRE-FABRICATED HANGAR BASED ON PNEUMATIC FORMWORK | 2020 |
|
RU2747998C1 |
METHOD FOR CONSTRUCTION OF LANCED DOME DESIGN | 2017 |
|
RU2694455C2 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD OF ERECTION OF FERROCONCRETE SPHERICAL VAULTS | 2001 |
|
RU2213835C2 |
APPARATUS FOR CONSTRUCTING A DOME ROOF OF A BUILDING ROUND IN PLAN VIEW | 0 |
|
SU1313986A1 |
METHOD OF CONSTRUCTING WAVY MONOLITHIC ARCHES AND FORMWORK FOR ITS IMPLEMENTATION | 2014 |
|
RU2615202C2 |
0 |
|
SU81192A1 | |
COMPOSITE BEARING BLOCK AND FIELD CONNECTION OF BEARING BLOCKS OF PREFABRICATED BUILDING STRUCTURE | 2012 |
|
RU2519021C2 |
Authors
Dates
2004-07-20—Published
2002-11-18—Filed