FIELD: mining industry.
SUBSTANCE: method includes upward excavation by horizontal layers, cutting of ore mainly by horizontal blast-holes, distribution of cut ore and filling of excavated space by non-ore filling of empty rock, and excavation of next shafts in current layer is performed from filling surface. With ore cutting in excavated layer partial distribution of it is performed. Remaining ore is stored within the chamber until the layer is fully excavated and chamber is filled. After that ore is distributed and concurrently chamber is filled by non-ore filling, from surface of which next layer is excavated.
EFFECT: lower costs of extraction and processing of ore due to better use of equipment, lower losses of cut ore and lesser pollution of it.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
METHOD OF UNDERGROUND DEVELOPMENT OF THE INCLINED ORE DEPOSITS | 2017 |
|
RU2651727C1 |
METHOD OF MINING OF JOINTLY OCCURRING STEEP THIN ORE BODIES IN STABLE AND MEDIUM-STABLE ROCKS | 2001 |
|
RU2209972C2 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2755287C1 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2762170C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
MINING METHOD OF THIN FLAT ORE BODY | 2010 |
|
RU2456452C2 |
METHOD FOR DEVELOPMENT OF FLAT DIPPING NARROW VEINS | 2020 |
|
RU2725353C1 |
Authors
Dates
2004-07-20—Published
2002-10-23—Filed