FIELD: well drilling equipment, particularly for isolation thereof.
SUBSTANCE: method involves mudding pore channels of bed during initial bed drilling with the use of drilling fluid and drilled rock particles. Drilling fluid includes plugging mixture to create shield impermeable to bed water around well shaft. Shield is formed of solid particles of drilling fluid and plugging mixture. Depth of their penetration into bed is calculated from mathematical expression. Device for above method realization includes body, rubber members arranged on body and bushings. Body is provided with thread made on ends thereof. Bushing dimension is selected according to mathematical expression and provides through channels between rubber members.
EFFECT: prevention of water inflow during initial drilling in water-developed bed.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BOREHOLE FIXING AND GEAR FOR ITS IMPLEMENTATION | 1993 |
|
RU2057905C1 |
DEVICE FOR SELECTIVE ISOLATION OF BED | 1998 |
|
RU2145661C1 |
GROUTING MORTAR AND METHOD FOR ITS USE FOR TEMPORARY LINING OF WELLS | 1994 |
|
RU2067156C1 |
METHOD OF INSULATING WATER-DEVELOPMENT STRATA | 1997 |
|
RU2152507C1 |
METHOD OF ISOLATION OF LOST CIRCULATION ZONES IN WELL | 1997 |
|
RU2141029C1 |
METHOD OF WELL CONSTRUCTION COMPLETION | 2000 |
|
RU2161247C1 |
WATER SHUT OFF METHOD | 2008 |
|
RU2374428C1 |
ISOLATION OF WATER INFLOW BEDS AT WELL CONSTRUCTION | 2013 |
|
RU2526061C1 |
METHOD OF WELL COMPLETION | 1997 |
|
RU2140521C1 |
METHOD FOR ISOLATION OF WATER-BEARING BEDS | 1995 |
|
RU2106477C1 |
Authors
Dates
2004-08-27—Published
2001-08-29—Filed