FIELD: borehole drilling. SUBSTANCE: this method of borehole fixing involves filling of hole clearance with nonhardening viscous-ductile grouting with required strength of structure which is determined by calculation. After exploitation is terminated casing pipes are removed out of borehole. Gear for implementation of method has two concentric pipes which are radially connected by means of metal bushings. Stoppers made of material readily soluble in acid are screwed into them. EFFECT: reliable separation of seams opened by borehole without decrease of their productivity factor. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR SELECTIVE ISOLATION OF BED | 1998 |
|
RU2145661C1 |
GROUTING MORTAR AND METHOD FOR ITS USE FOR TEMPORARY LINING OF WELLS | 1994 |
|
RU2067156C1 |
WATER-BEARING BED ISOLATION METHOD | 2005 |
|
RU2299308C2 |
MULTIBRANCH WELL CONSTRUCTION METHOD | 2004 |
|
RU2279522C2 |
METHOD OF FORMATION ISOLATION | 2001 |
|
RU2187622C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD FOR ELIMINATION OF FLUID CROSSFLOWS IN A WELL | 2018 |
|
RU2702455C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
DEVICE FOR FORMATIONS SEGREGATION | 2000 |
|
RU2182958C2 |
METHOD OF SEGREGATION OF FORMATIONS IN WELL | 1999 |
|
RU2183265C2 |
Authors
Dates
1996-04-10—Published
1993-10-26—Filed