FIELD: construction.
SUBSTANCE: pipeline provided with pontoon-heavers filled with a loose material for control its buoyancy is submerged by filling the pontoons-heavers with fluid. The pontoons-heavers are made of soft containers provided with two soft pressure-tight vessels connected with the pipeline and filled with soil. Each vessel is provided with a soft filling hose, means for its shutting off, and valves for filling the vessels with fluid and discharging air. The longitudinal axes of the pressure-tight vessels are parallel to the longitudinal axis of the pipeline. The soft vessels are additionally interconnected.
EFFECT: simplified design.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING TECHNOLOGICAL CROSSING OVER OBSTACLE (VERSIONS) | 2003 |
|
RU2221954C1 |
PIPELINE BALLASTING TEXTILE CONTAINER | 2002 |
|
RU2214546C1 |
TEXTILE CONTAINER FOR BALLASTING PIPELINES (VARIANTS) | 2003 |
|
RU2227858C1 |
BALLASTING DEVICE | 2005 |
|
RU2266457C1 |
POLYMERIC-CONTAINER BALANCING DEVICE FOR PIPELINE | 2005 |
|
RU2274794C1 |
POLYMERIC CONTAINER BALLASTING DEVICE FOR UNDERGROUND PIPELINE AND SPACING FRAME FOR UNDERGROUND PIPELINE POLYMERIC CONTAINER BALLASTING DEVICE | 2007 |
|
RU2320914C1 |
POLYMER CONTAINER BALLASTING UNIT | 2003 |
|
RU2220351C1 |
BRACE FRAME FOR UNDERGROUND PIPE LINE WEIGHTING MATERIAL | 2005 |
|
RU2289054C1 |
MODULAR LOADER FOR PIPELINE BALLASTING (VERSIONS) | 2008 |
|
RU2345265C1 |
METHOD AND DEVICE FOR UNDERGROUND PIPELINE LAYING | 2005 |
|
RU2269711C1 |
Authors
Dates
2004-08-27—Published
2003-10-15—Filed