METHOD FOR SEALING BROKEN COLUMN IN A WELL Russian patent published in 2004 - IPC

Abstract RU 2237151 C2

FIELD: well maintenance technology.

SUBSTANCE: method includes lowering device into the well, directing said device towards broken portion, pumping cementing solution behind broken column, time delay until cementing solution hardens. Device used in the process includes directing localizing assembly, shell with swelling substance and perforated tail piece. Device is directed with possible fixing of directing localizing assembly and shell with swelling substance in the column below breach zone and overlapping of the very broken portion by tail piece with localization of lower and upper portions of column. After expansion of shell with swelling substance and mating of said shell with column tool is dismounted from perforated tail piece and is raised onto the surface. Pumping of cementing solution behind broken column is performed through perforation of tail piece after raising tool onto surface and lowering of another tool into the well. During drilling of remaining cement stone within the column also drilled are remains of stone in tail piece, ends of shell, swelling substance from the shell and directing localizing assembly.

EFFECT: restored passability of tool, liquidated depressurization of column with the well back in operation.

3 dwg

Similar patents RU2237151C2

Title Year Author Number
DEVICE FOR PRESSURIZATION OF TORN COLUMN IN A WELL (VARIANTS) 2002
  • Jur'Ev V.A.
  • Budnikov V.F.
  • Tsar'Kova L.M.
  • Markov A.V.
  • Manukov R.S.
  • Krivchik V.N.
  • Samorodskaja N.E.
  • Mikhajlenko Ju.G.
RU2242582C2
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Ponomarev Andrej Aleksandrovich
  • Aleksandrov Vadim Mikhajlovich
RU2661935C1
DRILLING METHOD OF OIL WELL OFFSHOOT IN RESERVOIRS WITH HIGH CONDUCTIVITY 2014
  • Urazakov Kamil Rakhmatullovich
  • Bajkov Vitalij Anvarovich
  • Bykov Sergej Vladimirovich
  • Fakhretdinov Irnat Vjacheslavovich
RU2564421C1
DEVICE FOR INSTALLING AND SEALING CASING LINER IN WELL 2008
  • Makhmutov Il'Gizar Khasimovich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Semenov Aleksandr Nikolaevich
  • Sulejmanov Farid Bashirovich
RU2377391C1
METHOD FOR SEALING PRODUCTION STRING OF PRODUCTION WELL 2020
  • Ziiatdinov Radik Ziauziatovich
RU2730157C1
METHOD OF CEMENTING FLOW STRING IN OPERATION 0
  • Gabdullin Rafagat Gabdelvaleevich
  • Latypov Salimzyan Sabirovich
  • Shakurov Rasikh Akhatovich
SU1717791A1
METHOD OF STABILIZING BOTTOM-HOLE FORMATION ZONE 2000
  • Basarygin Ju.M.
  • Budnikov V.F.
  • Shcherbinin V.I.
  • Klimenko N.A.
  • Jur'Ev V.A.
  • Zakharov A.A.
  • Tsar'Kova L.M.
RU2196220C2
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES 2021
  • Leontev Dmitrii Sergeevich
  • Trifonov Andrei Vladimirovich
RU2774251C1
METHOD OF SECURING A HIDDEN CASING STRING OF A BOREHOLE WITH ROTATION AND CEMENTING OF THE ZONE ABOVE THE PRODUCTIVE FORMATION 2020
  • Antipov Sergei Petrovich
  • Lebedev Artem Mikhailovich
  • Mardanshin Karim Marselevich
  • Sharafetdinov Elvir Anisovich
RU2745147C1
DEVICE FOR PIPE LINER INSTALLATION AND SEALING IN WELL 2004
  • Sekisov A.V.
  • Vitjazev O.L.
RU2266391C1

RU 2 237 151 C2

Authors

Jur'Ev V.A.

Budnikov V.F.

Tsar'Kova L.M.

Markov A.V.

Manukov R.S.

Nikitin M.M.

Samorodskaja N.E.

Mikhajlenko Ju.G.

Dates

2004-09-27Published

2002-03-19Filed