FIELD: hydraulic structures, particularly solidifying erosive or sagging ground.
SUBSTANCE: chute comprises inlet, water-pass and outlet parts having trapezoidal cross-sections, formed of gabions filled with stones and laid on prepared base made as inverse filter. Outlet part is made as water apron. Inlet, water-pass and apron parts are connected one to another and are not separated one from another by structural joints. Above parts are created of semi-cylindrical gabions so that gabion ridges face upwards and extend transversely to longitudinal axis of water flow. Gabions are formed by connecting upper and lower nets placed in water flow direction with the use of wires and by filling gap between nets with stones. Cavities defined between semi-cylindrical gabions and having curvilinear triangular cross-section with apex facing downwards are filled with concrete so that functional joints are created along gabion ridges. Inlet part adjoining water inlet channel and outlet part end are embedded in ground.
EFFECT: increased efficiency and operational reliability, extended service life.
4dwg
Title | Year | Author | Number |
---|---|---|---|
FLEXIBLE CONNECTING STRUCTURE | 2004 |
|
RU2256025C1 |
OPEN SPILLWAY ON NON-ROCK FOUNDATION | 2008 |
|
RU2375520C1 |
METHOD FOR FLEXIBLE INTERFACE STRUCTURE CONSTRUCTION | 2004 |
|
RU2266363C1 |
CULVERT IN CONDITIONS OF PERMANENTLY FROZEN SOILS ON PERIODIC WATER COURSE | 2008 |
|
RU2375519C1 |
COMBINED REINFORCEMENT OF SLOPES | 2001 |
|
RU2212495C2 |
TWO-STEPPED DIFFERENCE COMBINED CONSTRUCTION | 2018 |
|
RU2685401C1 |
CULVERT UNDER BANKED EARTH IN CONDITIONS OF PERMANENTLY FROZEN GROUNDS IN PERIODIC WATER COURSE | 2008 |
|
RU2381327C1 |
WATER-ENGINEERING SYSTEM ON PERPETUALLY FROZEN SOILS | 2008 |
|
RU2374387C1 |
SOIL NON-HOMOGENUOUS FILL DAM | 2008 |
|
RU2377363C1 |
TWO-STEP CROSSHEAD OF COMBINED STRUCTURE | 2016 |
|
RU2633788C1 |
Authors
Dates
2004-10-27—Published
2002-08-19—Filed