FIELD: oil extractive industry.
SUBSTANCE: method includes adjusting product extraction flow and water influx in process of extraction of deposit, for which purpose pump of each extractive well is provided with frequency-adjusted drive, stable operation of product and force pumps is reached by fixing power fed to these, product debit is determined and amount of water in it, then frequency of feeding voltage is measured by frequency adjusted drive and operation for each product well is optimized on basis of minimal value of water level and/or maximum value of oil debit.
EFFECT: lower energy costs, higher oil yield.
2 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TRANSFERRING WELLS TO OPTIMALLY EFFICIENT OPERATION MODE | 2005 |
|
RU2289019C1 |
METHOD FOR BRINGING FORMATION-WELL-PUMP SYSTEM INTO EFFECTIVE OPERATING MODE WITH THE USE OF INDICATOR DIAGRAM | 2004 |
|
RU2283425C2 |
METHOD OF EVALUATION OF SPACE DISTRIBUTION OF OIL SATURATED REGIONS IN WATERED BEDS | 2007 |
|
RU2343274C1 |
METHOD FOR NON-STATIONARY EXTRACTION OF OIL FROM BED | 2004 |
|
RU2288352C2 |
METHOD OF NONSTATIONARY EXTRACTION OF OIL FROM ZONAL NONHOMOGENEOUS FORMATION AS TO PERMEABILITY | 2011 |
|
RU2485298C1 |
METHOD FOR DETERMINING GEOMETRICAL DIMENSIONS AND AZIMUTH LOCATION OF OIL-SATURATED ZONES IN FLOODED BEDS | 2009 |
|
RU2413065C1 |
METHOD FOR INCREASING THE EFFICIENCY OF HYDRODYNAMIC METHODS FOR INCREASING THE PETROLEUM RECOVERY OF A RESERVOIR | 2020 |
|
RU2759143C1 |
PROCESS OF EXTRACTION OF WELL FLUID | 2001 |
|
RU2190087C2 |
PROCEDURE BRINGING WELL TO OPTIMUM CONDITION AFTER REPAIR | 2001 |
|
RU2202034C2 |
DEEP STATION FOR MEASURING PARAMETERS OF OIL AND GAS PRODUCT WELLS | 2003 |
|
RU2246003C2 |
Authors
Dates
2004-11-20—Published
2002-08-20—Filed