TUBE BUILDING STRUCTURE Russian patent published in 2004 - IPC

Abstract RU 2241100 C1

FIELD: building, particularly frames made of steel tubes filled with concrete.

SUBSTANCE: tubular structure comprises steel tubes with concrete cores arranged coaxially and connected one to another and to horizontal bearing beams by main connection unit filled with concrete. Main connection unit is made as three hollow steel cylinders secured one to another by their bases, namely upper, medium and lower cylinders. Height of each cylinder is 0.5 - 1.5 of outer diameter of tubes to be connected. Upper and lower cylinders have outer diameters equal to 0.8 - 0.99 of inner tube diameter, medium cylinder with outer diameter equal to 1.01-1.15 of outer one of lower tube has orifices. Orifice axes are located at middle point along side cylinder wall height to insert ends of horizontal beams into medium cylinder for a distance equal to 0.4 - 0.8 of inner cylinder radius. Beam ends have perforations or slots to connect beam ends one to another by steel members, particularly by retaining ring. Orifices formed in side surface of medium cylinder have threads.

EFFECT: reduced time of frame erection, reduced cost, increased strength and load bearing capacity thereof.

2 cl, 2 dwg

Similar patents RU2241100C1

Title Year Author Number
TUBULAR BUILDING CONSTRUCTION 2007
  • Bikbau Marsel' Janovich
  • Bikbau Jan Marsel'Evich
RU2342501C1
TUBULAR BUILDING STRUCTURE 2012
  • Bikbau Marsel' Janovich
  • Bikbau Ul'Jana Marsel'Evna
RU2496949C2
METHOD TO CONNECT GUNCRETE PILLARS AT HEIGHT AND SLABS 2011
  • Afanas'Ev Aleksandr Alekseevich
  • Kurochkin Aleksandr Vjacheslavovich
RU2464389C2
UNIT FOR INTERFACING PIPE CONCRETE PILLARS-COLUMNS WITH SUPPORT BEAMS (EMBODIMENTS) 2019
  • Kazakov Yurij Nikolaevich
  • Alekseev Evgenij Aleksandrovich
RU2716751C1
UNIT FOR JOINTING PIPE-CONCRETE COLUMNS WITH TIE BEAMS 2018
  • Veselov Vitalij Vladislavovich
  • Abaturova Tatyana Dmitrievna
RU2691249C1
METHOD OF CONSTRUCTING A CONICAL HEAD FOR TUBULAR CONCRETE COLUMNS WITH CIRCULAR CROSS-SECTION 2020
  • Biryukov Yurij Aleksandrovich
  • Biryukov Aleksandr Nikolaevich
  • Dobryshkin Evgenij Olegovich
  • Biryukov Dmitrij Vladimirovich
  • Biryukov Nikolaj Aleksandrovich
  • Glyakov Maksim Yurevich
  • Savchuk Aleksandr Dmitrievich
  • Rozdobutko Matvej Ruslanovich
  • Babenko Vladimir Mikhajlovich
RU2747999C1
BUILDING FRAME 1993
  • Juola Tuomo
RU2120002C1
PILE INSTALLATION METHOD 2023
  • Emkuzhev Timur Mulidovich
RU2808246C1
JUNCTIONAL COUPLING OF PILLAR WITH SOLID SLAB 2013
  • Vasil'Ev Anton Vladimirovich
  • Potapov Jurij Borisovich
RU2564720C2
STEEL-AND-CONCRETE FRAME OF MULTISTORY BUILDING 2000
  • Mordich Aleksandr Ivanovich
  • Vigdorchik Roman Isaakovich
  • Sokolovskij Leonid Viktorovich
  • Galkin Sergej Leonidovich
  • Koljada Julija Anatol'Evna
RU2187605C2

RU 2 241 100 C1

Authors

Bikbau M.Ja.

Timerbulatov T.R.

Dates

2004-11-27Published

2003-06-18Filed