FIELD: construction.
SUBSTANCE: method of installing piles is characterized by the fact that before the installation of piles begins, wells are drilled under the installed piles; drilling is carried out to a depth greater than the length of the pile pipe. Concreting is carried out at the bottom of the well, during which a concrete base is formed. Then a pile pipe is driven into the wells, placing it at the lower level on top of the concrete base, reinforcement is installed into the driven and mounted pipe, and the interior of the pipe is concreted. A head with a damper piston is mounted in the upper part of the pipe, a damper head is placed above the head, on the lower side of which a damper cylinder is mounted in response to the damper piston, and a damper is placed inside the damper cylinder.
EFFECT: ensuring the integrity of the structure during seismic activity.
1 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
INJECTION PILE AND RETAINING WALL BUILT OF PILE FOUNDATION | 2004 |
|
RU2281997C2 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD FOR PILE-AND-SLAB FOUNDATION CONSTRUCTION IN SEISMIC AREAS | 2005 |
|
RU2300604C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
PILE FOUNDATION | 0 |
|
SU996639A1 |
REINFORCED CONCRETE DIAMOND-SHAPED PILE-COLUMN OF INCREASED CARRYING CAPACITY | 2018 |
|
RU2681324C1 |
METHOD FOR CONSTRUCTION OF PILE-PLATE FOUNDATION | 2021 |
|
RU2774443C1 |
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION | 2016 |
|
RU2657885C2 |
PILE FOUNDATION | 0 |
|
SU988981A1 |
Authors
Dates
2023-11-28—Published
2023-05-22—Filed