FIELD: pressure vessels.
SUBSTANCE: gas accumulator has at least one vessel provided with the neck for supplying and discharging gas. The bottom part of the internal space of the vessel is connected with the discharge opening. The vessel is provided with valving for connecting it with the means for filling the vessel with water and internal space of the vessel with the atmosphere. The upper part of the internal space of the vessel is connected with the by-pass opening for returning gas to the operation line.
EFFECT: improved design and enhanced safety.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FILLING VESSEL WITH GAS | 2005 |
|
RU2300695C9 |
METHOD FOR REMOVING GAS FROM A VESSEL DURING DECOMMISSIONING | 2005 |
|
RU2317478C9 |
MOVABLE GAS-FILLING MACHINE | 2018 |
|
RU2709163C1 |
METHOD FOR TESTING OF HIGH-PRESSURE VESSELS AND CAR FOR THEIR TRANSPORTATION | 2003 |
|
RU2261387C2 |
CONTAINER FOR CYLINDERS WITH COMPRESSED NATURAL GAS | 2017 |
|
RU2657841C1 |
UNIT TO FILL CYLINDERS WITH LIQUEFIED GAS | 2007 |
|
RU2332612C1 |
PLANT TO DRAIN LIQUEFIED HYDROCARBON GASES (LHG) FROM TANK CAR, METHOD OF LHG DRAINING FROM TANK CAR WITH APPLICATION OF SAID PLANT, PLANT FOR DEGASSING OF SAID TANK CAR WITH ITS APPLICATION AS WELL AS METHOD OF LHG DRAINING AND TANK GAS DEGASSING WITH APPLICATION OF THESE PLANTS | 2014 |
|
RU2553850C1 |
METHOD FOR PREPARING GAS TANKS TO REPAIRING AND(OR) TO TECHNICAL INSPECTION AND APPARATUS FOR PERFORMING THE SAME | 2001 |
|
RU2205709C2 |
METHOD OF PREPARING RAILWAY TANK WAGON FOR REPAIR OR FILLING WITH LIQUEFIED HYDROCARBON GAS AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2633917C2 |
GAS AND GAS CONDENSATE WELL ANALYSIS UNIT | 2013 |
|
RU2532050C2 |
Authors
Dates
2004-12-20—Published
2003-03-03—Filed