FIELD: oil and gas extractive industry.
SUBSTANCE: method includes placing containers in horizontal portion of well on tubing string, inside of which deep autonomous devices are placed. Placement of autonomous deep equipment on tubing string is performed accordingly to geophysical characteristics of deposit portions. Containers are made as pipe portions, with slits cut therein. In tubing string in vertical well portion a pump is placed, below which a filter made of perforated portion of tubing string pipe. Through slits in containers and through filter well liquid is taken to pump inlet along tubing string and along inter-tubular space. Excitation of well is performed by mounted pump. Data are interpreted according to calculation algorithm.
EFFECT: simplified process, higher trustworthiness.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDRODYNAMIC INVESTIGATIONS OF HORIZONTAL WELLS IN REAL TIME | 2011 |
|
RU2483212C1 |
PROCEDURE FOR SURVEY OF MULTI-HOLE HORIZONTAL WELL | 2009 |
|
RU2394985C1 |
PROCEDURE FOR SURVEY OF MULTI-HOLE HORIZONTAL WELL | 2012 |
|
RU2513961C1 |
SURVEYING METHOD OF HORIZONTAL WELL | 2010 |
|
RU2406822C1 |
DEVICE FOR OPERATION OF WELL, EQUIPPED BY ELECTRICAL CENTRIFUGAL PUMP | 2009 |
|
RU2386807C1 |
METHOD TO PERFORM SURVEY OF WELL PROVIDED WITH SUCKER-ROD PUMP | 2005 |
|
RU2280158C1 |
METHOD OF SELECTIVE HYDRODYNAMIC RESEARCHES IN WELLS AT MULTI-ZONE METHAN COAL DEPOSITS | 2016 |
|
RU2611780C1 |
WELL JET PLANT FOR SELECTIVE TESTING OF BEDS | 2010 |
|
RU2449182C1 |
METHOD FOR STUDYING DIRECTIVE AND HORIZONTAL WELLS DURING PUMPING OPERATION | 2023 |
|
RU2810764C1 |
WELL PUMPING PLANT FOR INJECTION OF FORMATION WATER INTO OIL-BEARING FORMATION | 2000 |
|
RU2162964C1 |
Authors
Dates
2004-12-27—Published
2003-11-13—Filed