FIELD: oil and gas extractive industry.
SUBSTANCE: method includes mounting debit meters above each productive bed with local power source connected to electronic counter with memory block, before lowering pump into well. If necessary debit meters are raised to surface and oil extraction from each layer is determined. Dependently on debit meters indications if detecting a substantial decrease of oil yield from any bed treatment of face-adjacent area of this bed sis performed and mode of forcing working agent into non-satisfactory bed is changed.
EFFECT: higher efficiency.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO DEVELOP MULTIZONE OIL RESERVOIR | 2011 |
|
RU2491418C1 |
MULTIZONE OIL RESERVOIR DEVELOPMENT METHOD | 2006 |
|
RU2303125C1 |
OIL FIELD DEVELOPMENT METHOD | 2004 |
|
RU2266397C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2417306C1 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2557282C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2578090C1 |
PROCEDURE FOR ELIMINATION OF CROSS-FEEDS | 2010 |
|
RU2413840C1 |
WELL STRUCTURE AND METHOD OF MULTIPAY OIL POOL DEVELOPMENT | 2007 |
|
RU2344272C2 |
DEVELOPMENT METHOD OF OIL FIELD WITH WATER-OIL ZONES | 2009 |
|
RU2386795C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT WITH HORIZONTAL WELLS | 2011 |
|
RU2474678C1 |
Authors
Dates
2004-12-27—Published
2003-04-07—Filed