FIELD: oil and gas extractive industry.
SUBSTANCE: method includes pumping of replacing agent through force wells. Cyclic vibro-seismic treatment with alternating frequencies is performed on bed, using ground vibration sources. Composition and amount of extracted fluid is determined after and before treatment. Dominating frequencies of bed are detected on basis of reaction of micro-seismic noise thereof on vibro-seismic treatment. Additional vibro-seismic treatment is performed by signal being a total of at least two monochromatic signals with frequencies equal to dominating frequencies of block of productive oil deposit bed. Treatment is performed till development of cracks, while placing blocks in resonance oscillations, and separating of inner potential energy, providing for intensification of processes of forming of clusters in extensive zone from blocks of productive bed having different sizes.
EFFECT: higher oil yield.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF OIL-GAS DEPOSIT | 1993 |
|
RU2078913C1 |
METHOD OF WAVE TREATMENT, MAINLY, PRODUCING FORMATIONS | 2000 |
|
RU2196225C2 |
METHOD OF DEVELOPING FLOODED OILFIELD | 0 |
|
SU1596081A1 |
HYDROCARBON RESERVOIR DEVELOPMENT METHOD | 2004 |
|
RU2261985C1 |
METHOD OF HYDROCARBONE FIELD DEVELOPMENT | 2009 |
|
RU2377398C1 |
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT WITH PHYSICAL EFFECT ONTO GEOLOGICAL MEDIUM | 2007 |
|
RU2349741C2 |
METHOD OF HYDROCARBON POOL DEVELOPMENT | 2002 |
|
RU2191891C1 |
PROCESS OF EXPLOITATION OF FLOODED OIL DEPOSITS | 1992 |
|
RU2057906C1 |
METHOD OF HYDROCARBON POOL DEVELOPMENT | 2002 |
|
RU2191890C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2005 |
|
RU2291955C1 |
Authors
Dates
2005-01-20—Published
2003-02-28—Filed