FIELD: construction.
SUBSTANCE: pipeline has triply connected supports mounted on the stable sections above and under the slope subject to creep, one connected supports arranged over the subject to creep slope, and deformation compensator. The distance between the upper support and site of the deformation compensator arranged below the slope subject to creep is determined from the formula proposed.
EFFECT: enhanced reliability of the pipeline.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
GROUND PIPE LINE ON SLIDE SLOPE | 1995 |
|
RU2093749C1 |
SLUMP SLOPE REINFORCEMENT METHOD | 2007 |
|
RU2340729C1 |
METHOD TO DETERMINE DEPTH IN LANDSLIP-HAZARDOUS ROOT MASSIF OF POTENTIALLY DEFORMABLE HORIZON | 2009 |
|
RU2412305C1 |
DANGEROUS LANDSLIDE SLOPE MASSIF STRENGTHENING METHOD | 2009 |
|
RU2413056C1 |
METHOD FOR MONITORING AND FORECASTING LANDSLIDE HAZARD | 2018 |
|
RU2686383C1 |
METHOD OF DETERMINING NATURAL SHEAR CHARACTERISTICS OF GROUND ON LANDSLIDE SLOPES | 1996 |
|
RU2101417C1 |
METHOD TO STRENGTHEN LANDSLIDE-HAZARDOUS BOARDS OF OPENCAST MINES | 2010 |
|
RU2449088C2 |
A METHOD OF DETERMINATION OF NATURAL ROCK SHEARING STRENGTH CHARACTERISTICS IN MASSIFS | 0 |
|
SU1671770A1 |
TECHNOLOGY TO STABILISE SLIDE SLOPES WITH STREAMLINED DEWATERING WELLS | 2010 |
|
RU2421573C1 |
METHOD FOR INVESTIGATION OF GEOLOGICAL MASSES SUBJECTED TO LANDSLIDE OCCURRENCES | 1998 |
|
RU2130527C1 |
Authors
Dates
2005-02-10—Published
2003-07-02—Filed