MONOLITHIC SOLID PRESTRESSED PLATE-AND-RIB BRIDGE SPAN STRUCTURE Russian patent published in 2005 - IPC

Abstract RU 2249068 C1

FIELD: bridge building.

SUBSTANCE: bridge span structure includes roadway section, longitudinal girders connected to it, end and above-pier transversal diaphragms, channel forming means, prestressed reinforcing rod bundles arranged in channel forming means and having active, passive and dead anchors. Each longitudinal girder has U-shaped cross-section and consists of two longitudinal ribs connected one to another by panel in top parts thereof. Each longitudinal girder is provided with bosses located on inner panel and rib sides. Bosses disposed on inner panel sides are embedded in longitudinal ribs by sides thereof. Prestressed reinforcement consists of lower bundles, upper bundles, transit linear bindles and polygonal bundles. Lower bundles are located in groups in longitudinal ribs of U-shaped longitudinal girders in all spans of span structure. Passive and/or active anchors thereof are supported by bosses located on inner sides of longitudinal ribs. Upper bundles are arranged in groups in near-pier panel parts of U-shaped girders and passive and/or active anchors thereof are secured to bosses located on inner sides of panel. Transit linear bundles extend through the whole span structure and have dead and/or active anchors supported by end transversal diaphragms. Polygonal bundles are located in lower area of longitudinal robs and pass into upper panel area and extend in reverse direction. Polygonal bundles terminate in central parts of adjoining spans. Active anchors of polygonal bundles are supported by end transversal diaphragms. Dead anchors are built in concrete body of longitudinal U-shaped girders.

EFFECT: possibility to create span structure with efficient cross-section having prestressed reinforcement arranged in accordance with momentum curve, reduced concrete consumption and decreased number of reinforcement rods.

2 cl, 15 dwg

Similar patents RU2249068C1

Title Year Author Number
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION 2004
  • Kurakin P.P.
  • Korotin V.N.
  • Chalenko V.V.
  • Dudarev S.V.
  • Melkonjan A.S.
  • Birjukov E.N.
  • Potapov S.V.
RU2242559C1
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS 2002
RU2251604C2
METHOD FOR REINFORCED CONCRETE BRIDGE CONSTRUCTION 2004
  • Fajko Jurij Ivanovich
RU2283911C2
METHOD FOR REINFORCEMENT OF PRESTRESSED UNITS IN SPAN STRUCTURES 1997
  • Kurakin P.P.
  • Korotin V.N.
  • Chalenko V.V.
  • Postovoj Ju.V.
  • Fedorov Ju.I.
  • Vinokur F.V.
  • Brejcher S.I.
  • Gugin I.M.
  • Kaljuga V.N.
  • Birjukov E.N.
RU2094579C1
MOTOR ROAD BRIDGE WITH CONTINUOUS REINFORCED CONCRETE SPAN STRUCTURES AND METHOD OF ERECTION THEREOF 2004
  • Kharebava Zhilo Antonovich
  • Bychkovskij Nikolaj Nikolaevich
  • Pshenichnikov Stanislav Konstantinovich
  • Schast'In Valerij Vladimirovich
  • Akatov Vjacheslav Pavlovich
  • Bychkovskij Sergej Nikolaevich
  • Passek Vadim Vasil'Evich
  • Velichko Vladimir Pavlovich
  • Didenko Aleksandr Borisovich
RU2275451C2
JOINT STRUCTURES FOR CONTINUOUS BRIDGE SPAN ASSEMBLIES IN OVER-PIER AREAS 2005
  • Sumin Mikhail Aleksandrovich
  • Sumin Aleksandr Mikhajlovich
RU2296193C1
STRENGTHENING CONTINUOUS SPAN OF BRIDGE 0
  • Eremeev Valerij Pavlovich
SU1601282A1
METHOD OF RECONSTRUCTION OF THE BRIDGE SPAN STRUCTURE WITH METALLIC DOUBLE-CANTILEVER ARCH 2018
  • Kazaryan Vilgelm Yurevich
  • Sakharova Inna Dmitrievna
RU2689009C1
STEEL/REINFORCED CONCRETE SPAN 1992
  • Utkin Vladimir Aleksandrovich
RU2040629C1
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST 2012
  • Bikbau Marsel' Janovich
  • Bikbau Ul'Jana Marsel'Evna
RU2513574C2

RU 2 249 068 C1

Authors

Monov B.N.

Matechenkov V.P.

Illarionov A.V.

Safonov A.V.

Raevskaja Ju.I.

Borovskikh L.D.

Konopel'Ko T.I.

Ponomarev B.V.

Dates

2005-03-27Published

2004-04-07Filed