FIELD: construction engineering.
SUBSTANCE: according to proposed method, first sheet pile with front lock is used which has inner space. Said pile is driven into ground protecting inner space of its front lock from ground getting inside. Second pile with rear lock and lock head is used. Head of rear lock of second pile is driven into space of front lock of first pile, and second pile is driven into ground. Binding material is used to connect first and second piles and limit longitudinal displacement of piles relative to each other in support wall. Novelty is that binding material is applied as surface layer on head of rear lock of second pile prior to fitting head into inner space of front lock of first pile.
EFFECT: provision of reliable connection of sheet piles in longitudinal direction owing to use of binding material.
10 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DRIVING SHEET PILES AND DEVICE FOR CLOSING AND SEALING INNER CAVITY OF SHEET PILE INTERLOCK | 2001 |
|
RU2254416C2 |
METHOD FOR PERMANENT SHEET PILE CONNECTION | 2001 |
|
RU2262572C2 |
LOCK JOINT OF INTERLOCKING ELEMENTS WITH A SEAL | 2021 |
|
RU2761335C1 |
METHOD TO CONTROL OPENING OF LOCK JOINT OF METAL SHEET PILES AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2517303C2 |
INTERLOCKING WALL WITH METAL SEALING ELEMENT | 2008 |
|
RU2368723C1 |
METHOD OF CONSTRUCTING WALL IN GROUND FOR PROTECTING FOUNDATION OF BUILDING | 1989 |
|
RU2023811C1 |
PROTECTIVE WALL OF GROOVED PANELS | 2007 |
|
RU2348755C1 |
END MOST ABUTMENT OF BRIDGE CROSSING FROM WELDED TUBULAR RABBET WITH FUNCTION OF RETAINING WALL | 2013 |
|
RU2543390C2 |
RETAINING WALL ON ROCKY GROUND | 2008 |
|
RU2382846C1 |
RETAINING WALL ON PERMAFROST SOIL (VERSIONS) | 2012 |
|
RU2502845C1 |
Authors
Dates
2005-04-20—Published
2001-03-22—Filed