FIELD: building, particularly to construct structures including wooden elements.
SUBSTANCE: method involves drilling holes in timbers, logs and other lumber; piercing timbers, logs and other lumber with transversal ties and tensioning thereof with nuts secured to ties; offsetting timbers, logs and other lumber in groups including two or more timbers, logs and other lumber relative previous ones during building erection so that extensions and depressions are formed in walls; applying glue between timbers, logs and other lumber; installing longitudinal ties in slots and connecting ends of each longitudinal tie not terminating at wall ends with one transversal tie; mounting walls on foundation; connecting all walls, intermediate walls and partitions; packing all joints along with mating extensions of one wall with depressions of another one; pressing all building components together with the use of ties and nuts; passing transversal ties through extensions of walls to be connected; tightening all joints by nuts through resilient members with force application thereto and securing floor, ceiling and roof panels to corbels having orifices for ties receiving. Above panels have vertical holes for ties insertion. Floor and corbel are supported by timbers or logs or other lumber. Walls are connected to foundation, floor, ceiling or roof through resilient members by transversal ties or nuts adapted to move in slots due to wood shrinking or becoming wet.
EFFECT: increased tightness of building joints, strength, reliability, service life, improved ecological safety, quality of building finishing, enhanced appearance, reduced time and cost of building erection.
5 cl, 7 dwg
Authors
Dates
2005-04-20—Published
2002-10-09—Filed