FIELD: construction.
SUBSTANCE: wall is erected from favus bars, consisting of three wooden walls and lock members perpendicular to them with holes drilled in the centre. Bars stacked on each other are fastened by means of vertical ties, installed in the foundation of building and passing through the transverse wooden walls of bars. Bars are connected by length via installing and gluing the dowels into the end cuts of longitudinal walls. Angle coupling of wooden bars is accomplished by placing part of one bar end, equal to the width of bar, formed by the outer and middle wall, perpendicularly to the sawed out groove of another bar at some distance from its end, and vertical compressor pumping of insulant (ecological cotton wool) is performed after construction of the first and subsequent floors.
EFFECT: increased air-tightness of the wall.
2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF BUILDINGS | 2023 |
|
RU2812973C1 |
METHOD FOR WOODEN BUILDINGS AND BUILDING STRUCTURES ERECTION | 2002 |
|
RU2250312C2 |
WOODEN STRUCTURE MADE OF PREFABRICATED PANELS | 1998 |
|
RU2135708C1 |
COLLAPSIBLE PREFABRICATED HOUSE FROM WOODEN BLOCKS AND METHOD OF ITS ERECTION | 2024 |
|
RU2840588C1 |
PREFABRICATED LOAD-BEARING STRUCTURE OF FLOORING AND METHOD FOR ITS FORMATION | 2020 |
|
RU2766109C2 |
CONSTRUCTION METHOD OF USING FRAMELESS WOODEN PANEL | 2015 |
|
RU2596167C1 |
LOW-RISE PRE-FABRICATED BUILDING | 2008 |
|
RU2387772C1 |
METHOD FOR FORMING A BAY WINDOW FOR A WOODEN BUILDING | 2022 |
|
RU2794438C1 |
ERECTION METHOD OF TIMBER HOUSES, CONSTRUCTIONS, STRUCTURES | 2009 |
|
RU2399729C1 |
BUILDING AND A METHOD FOR ERECTING IT | 1993 |
|
RU2036292C1 |
Authors
Dates
2014-10-20—Published
2013-05-17—Filed