FIELD: teaching and training technologies.
SUBSTANCE: during training mock-up sand box is used as well as models of excavating, excavating-transporting and load-raising vehicles. Operation of vehicles is demonstrated with stops and routes of movement of vehicles models. For forming of earth constructions on the sand of sand box auxiliary measuring and building tools are used. As models of vehicles models of bulldozer, scraper, excavator, hoisting crane are used.
EFFECT: higher efficiency.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
INTERACTIVE TACTICAL INSTALLATION | 2019 |
|
RU2711707C1 |
TEACHING STAND | 2001 |
|
RU2217799C2 |
METHOD FOR CONSTRUCTION OF EARTHWORK UNDER MINING CONDITIONS | 2008 |
|
RU2373333C1 |
TRAINING AND LEARNING SYSTEM | 2024 |
|
RU2834774C1 |
IMPROVED ROAD-BUILDING SOIL | 2013 |
|
RU2541009C2 |
ROAD-BUILDING COMPOSITE MATERIAL | 2013 |
|
RU2551560C2 |
TECHNOLOGY FOR PRODUCING A UNIVERSAL RECULTIVANT | 2021 |
|
RU2753423C1 |
PROCESSING METHOD OF DRILLING WASTES ON TERRITORY OF CLUSTER SITE | 2013 |
|
RU2551564C2 |
METHOD FOR OPEN UNDERGROUND DEVELOPMENT OF MAIN INCLINED MINE OPENINGS (SHAFTS) | 2013 |
|
RU2520225C2 |
RUNWAY CONSTRUCTION METHOD | 1998 |
|
RU2148119C1 |
Authors
Dates
2005-06-27—Published
2003-03-05—Filed