FIELD: oil production, particularly methods or apparatus for obtaining products from wells.
SUBSTANCE: method involves displacing working agent under elevated pressure and performing curing thereof. For bottomhole zone treatment bath for working agent having 4-6 m3 volume is provided in perforation interval and curing time is up to 9 hours. Working agent is displaced by discharge water in impulse draining mode including pressure increase at well head up to 11-13 MPa and pressure drop operations, wherein number of impulses is 30-50. Then 20-40 m3 of 3-8% hydrochloric acid solution is displaced, curing is performed for not more than 4 hours and discharge water is injected in amount of 20-40 m3.
EFFECT: increased intake capacity of well.
1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2009 |
|
RU2394980C1 |
WELL BOTTOM HOLE TREATMENT METHOD | 2002 |
|
RU2224089C1 |
METHOD OF BOTTOMHOLE ZONE TREATMENT | 2002 |
|
RU2208150C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL | 1997 |
|
RU2101483C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF INJECTION WELL | 1997 |
|
RU2114295C1 |
METHOD OF OIL POOL DEVELOPMENT | 2000 |
|
RU2156352C1 |
METHOD OF TREATMENT OF WELL BOTTOMHOLE ZONE WITH LOW BED PRESSURE | 2013 |
|
RU2537433C1 |
METHOD FOR COMPLEX WELL BOTTOM ZONE TREATMENT | 2004 |
|
RU2261986C1 |
METHOD OF HYDRAULIC FRACTURING IN INJECTION WELL | 2016 |
|
RU2603869C1 |
METHOD FOR REAGENT CLAY CAKE REMOVAL FROM WELL | 2011 |
|
RU2484244C1 |
Authors
Dates
2005-08-10—Published
2004-08-05—Filed