FIELD: oil production industry, particularly to determine initial data necessary for 3D computer oil-and-gas bed development modeling.
SUBSTANCE: method involves drilling vertical, horizontal or inclined well; opening oil-saturated interval of oil-and-gas bed; performing well survey in unsteady regime along with providing oil extraction regime with minimal possible well pressure, which results in artificial gas pollution and watering of extracted product. Well survey is performed under control of well pressure dynamics and oil, water and gas discharge of the well. Fluid saturation along well bore within the limits of opened interval is also measured. The obtained data are used to determine permeability index in longitudinal and transversal bedding directions, porosity, skin-factor, oil, water and gas mobility edge, powers of functional dependence of oil, gas and water relative permeability. Method is performed along with periodical well shutdown and following well starting-up is carried out under minimal possible well pressure.
EFFECT: increased accuracy and reliability of bed parameters, relative permeability for oil, gas and water determination.
3 cl, 5 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ACCURATE DETERMINATION OF DISPLACEMENT FACTOR AND RELATIVE PERMEABILITY | 2010 |
|
RU2445604C1 |
METHOD OF RESEARCH AND INTERPRETATION OF RESULTS OF WELL RESEARCH | 2014 |
|
RU2558549C1 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSITS | 1996 |
|
RU2107810C1 |
METHOD OF INVESTIGATION AND INTERPRETATION OF RESULTS OF WELL AND FORMATION INVESTIGATIONS | 2001 |
|
RU2213864C2 |
METHOD FOR OIL RESERVOIR DEVELOPMENT IN CARBONATE OR TERRIGENOUS FORMATION WITH DEVELOPED MACROCRACKS | 2004 |
|
RU2264533C2 |
METHOD FOR DETERMINING TYPE OF CARBONATE COLLECTOR ON BASIS OF DATA FROM SPECIALIZED WELL RESEARCH | 2003 |
|
RU2245442C1 |
METHOD FOR DEVELOPMENT OF OIL-GAS DEPOSITS | 1996 |
|
RU2109131C1 |
METHOD OF CONSTRUCTING GEOLOGICAL AND HYDRODYNAMIC MODELS OF OIL AND GAS FIELDS | 2020 |
|
RU2731004C1 |
METHOD FOR EDGE OIL RIM DEVELOPMENT | 2010 |
|
RU2442882C1 |
DEVELOPMENT METHOD OF OIL FRINGE IN CARBONATE RESERVOIR OF COMPLEX STRUCTURE | 2012 |
|
RU2509878C1 |
Authors
Dates
2005-08-10—Published
2004-06-29—Filed