FIELD: oil and gas producing industry, particularly for temporary completed gas well conservation for producing ability retention and acceleration of well putting into operation.
SUBSTANCE: method involves debugging well up to full industrial liquid carryover during well development; performing gas-dynamic investigations in the well and temporary conservation thereof till putting well into operation. Well preparation is carried out with the use of hydrate development inhibitor, namely methanol, which is injected to bottomhole and bottomhole area of the well to force industrial or condensation liquid into porous formation space farther from perforation interval, partial diluting formation with liquid and heating thereof up to formation temperature. Well putting into operation is performed without well heating by gas flaring. Gas saturated with warm methanol vapor is supplied from well directly in gas-collecting station of well cluster, gathering line and then is conveyed to complex gas preparation plant.
EFFECT: provision of well and gas-collecting equipment operation in non-hydrated mode during well putting into operation before increasing gas temperature at well head up to level increasing temperature of hydrate development due to well product saturation with warm methanol vapor.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PERFORMING SECOND COMPLETION OF RESERVOIRS IN GAS WELLS | 2005 |
|
RU2289681C1 |
METHOD FOR PRODUCTIVE RESERVOIRS TREATMENT IN GAS, GAS-CONDENSATE AND OIL WELL | 2006 |
|
RU2316645C1 |
METHOD FOR CLEANING THE GAS COLLECTION HEADER OF THE WELL PAD | 2021 |
|
RU2785098C1 |
METHOD TO CONTROL HYDRATE FORMATION PROCESS IN GAS-GATHERING FLOW LINES OF FAR NORTH GAS AND GAS CONDENSATE DEPOSITS | 2014 |
|
RU2560028C1 |
METHOD TO CONTROL HYDRATE FORMATION PROCESS IN GAS-GATHERING FLOW LINES CONNECTED TO COMMON MANIFOLD AT FAR NORTH GAS AND GAS CONDENSATE DEPOSITS | 2014 |
|
RU2573654C1 |
METHOD OF GAS AND GAS CONDENSATE FIELDS PLUMS START UP AFTER IT LONG TERM SHUT DOWN | 2008 |
|
RU2377400C1 |
METHOD FOR OPERATION OF GROUP OF WATERING WELLS | 2018 |
|
RU2679174C1 |
METHOD FOR DETERMINING SPECIFIC AND TOTAL QUANTITY OF LIQUID WATER PHASE SUPPLIED FROM WELL TO FIELD GAS-COLLECTING HEADER | 2010 |
|
RU2460879C2 |
METHOD FOR OPERATING GAS WELLS AT LATER STAGE OF NATURAL GAS FIELD DEVELOPMENT AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2760183C1 |
METHOD FOR PREVENTING HYDRATE FORMATION IN A GAS COLLECTION SYSTEM OF GAS CONDENSATE FIELDS | 2021 |
|
RU2778763C1 |
Authors
Dates
2005-08-27—Published
2004-04-19—Filed