FIELD: mining industry, particularly elimination of emergency situations.
SUBSTANCE: method involves closing borehole cross-section with extendable means; arranging predetermined volume of non-combustible material above the means, wherein the volume is determined from a given relation; discharging all non-combustible material in the borehole at a time and further distributing portions of non-combustible material having volumes of not less than volume of incoming water. Non-combustible material includes clay and pourable components which are laid in layers above the means, wherein clay volume is equal to pore volume of pourable component.
EFFECT: increased reliability of borehole sealing and water burst liquidation.
3 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ELIMINATING INRUSH OF WATER THROUGH VERTICAL GROOVE | 2007 |
|
RU2342536C1 |
VERTICAL EXCAVATION LIQUIDATION METHOD | 2004 |
|
RU2278267C1 |
METHOD OF LIQUIDATION OF VERTICAL MINE WORKINGS | 0 |
|
SU1142634A1 |
METHOD OF CLEANING SKIPSECTION SUMP OF MINE VERTICAL SHAFT | 0 |
|
SU1051292A1 |
METHOD FOR RECONSTRUCTION OF A FLOODED MINE MINED BY OPEN-UNDERGROUND METHOD | 2023 |
|
RU2798370C1 |
SHAFT-SINKING SET | 0 |
|
SU1133406A1 |
METHOD OF SINKING A MINE SHAFT | 0 |
|
SU1502837A1 |
SALINA DEVELOPMENT METHOD | 2009 |
|
RU2438017C2 |
METHOD FOR SINKING OF VERTICAL SHAFTS | 0 |
|
SU1809074A1 |
0 |
|
SU69513A1 |
Authors
Dates
2005-09-27—Published
2004-07-28—Filed