FIELD: mining.
SUBSTANCE: method involves execution of uncovering developments - capital transport and travelling slopes -to the lowest horizon; performance of ventilation and bottom gangways of the lower floor; performance of block transport and side slopes within each extraction section; penetration along the strike of chamber passways and development of deposits of the block and backfilling of chambers with washery refuse. Chamber backfilling is performed with delay from cleaning excavation by one or two chambers through the wells drilled from stowage slopes passed from ventilation gangway. Thickness of roof pillar is determined depending on thickness of load-carrying layer, bending strength of the rocks which are included in it, and width of chamber bay.
EFFECT: increasing salt extraction efficiency and safety; simplifying the technology providing ecological purity of environment.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING SALT DEPOSITS | 2003 |
|
RU2235879C1 |
METHOD OF SALT DEPOSIT MINING | 2001 |
|
RU2206745C1 |
DEVELOPMENT METHOD OF SERIES OF BEDS | 2009 |
|
RU2436956C2 |
METHOD FOR REPRODUCTION OF ORE DEPOSITS CONTOUR | 2008 |
|
RU2390043C2 |
METHOD OF BEDDED DEPOSIT DEVELOPMENT | 2006 |
|
RU2343284C2 |
METHOD OF SALT DEPOSIT MINING | 2002 |
|
RU2215146C1 |
METHOD OF MINING OF SALINE DEPOSITS | 2002 |
|
RU2209971C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF UNDERGROUND MINING OF MASSIVE STEEP ORE DEPOSITS | 2009 |
|
RU2411360C1 |
METHOD OF SHAFT PILLAR TREATMENT | 2003 |
|
RU2235204C1 |
Authors
Dates
2011-12-27—Published
2009-09-10—Filed