FIELD: oil industry, particularly for stimulating production.
SUBSTANCE: method for treating bottom zone of well provided with tubing string involves performing lowering of flexible extremeline elongated pipes of coiled tubing plant; injecting light-gravity oil in well and to bottom zone; moving flexible extremeline elongated pipes of coiled tubing plant to well bottom; continuing oil injection up to full well-killing fluid substitution for oil; lifting lower ends of flexible extremeline elongated pipes up to reaching production bed roof; sealing well; injecting 0.5-1.5 m3 of hydrochloric acid solution into bottom zone through flexible extremeline elongated pipes of coiled tubing plant; lowering ends of flexible extremeline elongated pipes of coiled tubing plant for 0.8-1.2 m and injecting 0.5-1.5 m3 of hydrochloric acid solution; continuing lowering and injection operations up to reaching production bed bottom; lifting lower ends of flexible extremeline elongated pipes of coiled tubing plant for height equal to half of well height and leaving the extremeline elongated pipes as they are for 2-3 hours; gradually lowering flexible extremeline elongated pipes of coiled tubing plant up to reaching well bottom and injecting oil simultaneously with well fluid extraction through hole annuity; flushing well with oil; removing flexible extremeline elongated pipes of coiled tubing plant from the well and closing hole annuity; performing setup operations and bringing well into operation.
EFFECT: increased well debit.
1 ex
Title | Year | Author | Number |
---|---|---|---|
ACID TREATMENT OF AN OIL EXPLOITATION WELL BOTTOM-HOLE AREA | 2011 |
|
RU2441979C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF PRODUCER | 2010 |
|
RU2415258C1 |
METHOD OF HORIZONTAL WELL OPERATION | 2007 |
|
RU2335621C1 |
ACID TREATMENT METHOD OF BOTTOMHOLE ZONE OF CLUSTER WELL | 2019 |
|
RU2713027C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF RESERVOIR OF OIL WELL | 2012 |
|
RU2519139C2 |
METHOD FOR ACID TREATMENT OF BOTTOMHOLE ZONE OF OIL PRODUCING AND INJECTION WELL | 2023 |
|
RU2819869C1 |
WELL REPAIR METHOD | 2004 |
|
RU2280754C1 |
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION LOCATED NEAR WATER-SATURATED FORMATION | 2015 |
|
RU2579069C1 |
METHOD FOR WATER INFLUX ZONE ISOLATION INSIDE WELL | 2006 |
|
RU2315171C1 |
HORIZONTAL WELL COMPLETION METHOD | 2015 |
|
RU2588108C1 |
Authors
Dates
2005-10-10—Published
2004-10-12—Filed