FIELD: gas-and-oil producing industry.
SUBSTANCE: procedure consists in lowering coil-tubing pipe through annular space of well, in pumping products for treatment and in start-up of well. As a production string and underground equipment there is used the string and equipment with diametre not over 2.5 inches. The coil-tubing pipe is lowered through annular space of the well with zenith angle of bore incline up to 30° when a well is equipped with 6 and more inch-production string, or with zenith angle of bore incline to 15° when a well is equipped with 5-inch production string. Before pumping products production string is filled with oil above the pump. Pressure in the production string from the wellhead is maintained higher, than in the coil-tubing pipe.
EFFECT: raised efficiency of procedure due to integrity of pump and due to round-trip operation of coil-tubing pipe through annular space of well.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL BOTTOM ZONE TREATMENT METHOD | 2004 |
|
RU2261991C1 |
ACID TREATMENT OF AN OIL EXPLOITATION WELL BOTTOM-HOLE AREA | 2011 |
|
RU2441979C1 |
METHOD OF HORIZONTAL WELL OPERATION | 2007 |
|
RU2335621C1 |
ACID TREATMENT METHOD OF BOTTOMHOLE ZONE OF CLUSTER WELL | 2019 |
|
RU2713027C1 |
WELL REPAIR METHOD | 2004 |
|
RU2280754C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF RESERVOIR OF OIL WELL | 2012 |
|
RU2519139C2 |
METHOD OF BOTTOMHOLE FORMATION ZONE TREATMENT IN PRODUCTION WELL | 2019 |
|
RU2724727C1 |
METHOD FOR ISOLATION OF FORMATION WATER INFLOW IN WELL | 2005 |
|
RU2296209C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
METHOD FOR ACID TREATMENT OF BOTTOMHOLE ZONE OF OIL PRODUCING AND INJECTION WELL | 2023 |
|
RU2819869C1 |
Authors
Dates
2011-03-27—Published
2010-06-07—Filed