FIELD: structure repair, particularly to repair roads.
SUBSTANCE: method involves forming orifices in defective road bed area; filling the orifices with building material along with compaction of building material. The orifices are formed by excavating ground from defective road bed area by paternoster elevator over the full road width or over half of road width so that another road half is worked up from another road side. Ground is excavated in direction transversal to road axis.
EFFECT: possibility to repair road bed without road covering removing.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF STRENGTHENING ROAD BED OF AUTOMOBILE ROADS IN PLACES OF CULVERTS | 2015 |
|
RU2588250C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
ROAD STRUCTURE | 2012 |
|
RU2516603C1 |
METHOD OF PATCHING ROAD PAVEMENT | 2018 |
|
RU2740138C2 |
METHOD FOR ENHANCING ROAD SUBGRADE | 2013 |
|
RU2529994C1 |
METHOD FOR ERECTION OF ROAD PAVEMENT | 2007 |
|
RU2351702C1 |
METHOD OF FORMING LAYERS OF ROAD PAVEMENT OF ROADS AND CITY STREETS | 2015 |
|
RU2585769C1 |
CORDUROYING MATERIAL FOR CONSTRUCTION OF ROADS | 2018 |
|
RU2735404C2 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
METHOD OF REPAIR OF ROAD SURFACING | 2009 |
|
RU2405081C1 |
Authors
Dates
2005-11-27—Published
2004-05-24—Filed