FIELD: construction.
SUBSTANCE: method for enhancing road subgrade includes planning of the road subgrade, stretching across its surface of geotextile and geogrid, filling of cells of geogrid with filler. Filler is previously placed on the surface of the subgrade in front of the road car, then it is supplied to the place of fixation of the stretched geogrid by means of intake working member and conveyor, plan and compact into two stages, at first along the entire surface of the geogrid, and then in the band of action of the most intense probable load in order to prevent the tread formation, moreover the filler is moistened before laying into the geogrid and compaction.
EFFECT: improved efficiency and quality of the protective layer formation, increased stability of the base.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
TRACK CONSTRUCTION COMPLEX | 2013 |
|
RU2532311C1 |
MECHANISED METHOD TO LAY GEOSYNTHETIC MATERIALS (GEOTEXTILE AND VOLUME GRATING) INTO ROAD STRUCTURE | 2010 |
|
RU2476634C2 |
METHOD TO LAY VOLUME GEOGRID INTO ROAD STRUCTURE, VOLUME GEOGRID AND LAYER FOR LAYING OF VOLUME GEOGRID | 2012 |
|
RU2527392C2 |
METHOD FOR INSTALLATION OF CELLULAR ROAD | 2015 |
|
RU2597349C1 |
BULK GEOGRID LAYING MACHINE | 2012 |
|
RU2521171C2 |
MACHINE TO LAY GEOSYNTHETIC MATERIALS INTO UNDERBALLAST LAYER OF RAILWAY GROUND WORK WITHOUT REMOVAL OF RAIL AND SLEEPER GRID | 2010 |
|
RU2477349C2 |
MACHINE FOR LAYING OF GEOSYNTHETIC MATERIALS INTO ROADBED AND METHOD OF ITS OPERATION | 2014 |
|
RU2594491C2 |
GEOWEB STACKER WITH EQUIPMENT FOR GEOWEB STORAGE AND STRAIGHTENING AT STACKING | 2012 |
|
RU2505640C1 |
METHOD OF CONSOLIDATION OF CONES OF BRIDGES AND/OR OVERPASSES | 2000 |
|
RU2182200C1 |
MULTILAYER MAT FOR DEVICE OF ROAD EMBANKING AND METHOD FOR ITS MANUFACTURE | 2023 |
|
RU2802766C1 |
Authors
Dates
2014-10-10—Published
2013-06-21—Filed