FIELD: site engineering, particularly post-construction survey for multi-story building erection.
SUBSTANCE: method involves using electronic tachometer to survey erected building structure frame elements at suggested two levels during erection-and-technological work performance; carrying out computer calculations within designated tolerance intervals to optimally select coordinate on the base of obtained real geometric centers of building structure frame elements. The computer calculations are aimed to provide maximal fit for designed geometrical shape and dimensions. Detailed location survey at next erection level is carried out on the base of above calculated and selected coordinates.
EFFECT: extended functional capabilities.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
MODE OF ADJUSTMENT OF MEASUREMENTS AT DETAIL STAKING WORKS ON HIGH INSTALLATION HORIZONS | 2004 |
|
RU2269095C2 |
METHOD OF ACCOMPLISHING LAYOUT WORK | 2000 |
|
RU2176778C1 |
METHOD FOR GEOMETRIC PROVISION OF DESIGN ANGLE OF GUY FIXATION TO BRIDGE SPAN | 2007 |
|
RU2395639C2 |
METHOD TESTING VERTICALITY OF CASING TUBE | 1997 |
|
RU2144656C1 |
SYSTEM FOR MONITORING AND MANAGING LIFE CYCLE OF OBJECT AND ITS INFRASTRUCTURE AND SYSTEM FOR MONITORING LOCATION AND CONDITION OF PERSONNEL AND (OR) OTHER MOBILE OBJECTS (OPTIONS) | 2019 |
|