FIELD: construction, road engineering.
SUBSTANCE: invention refers to construction of cable-braced bridges. Method for geometric provision of design angle of guy fixation to bridge span including supports, pylons, guys with anchor devices, stiffening beam. In process of assembly works, changes in geometric parametres of structure elements are calculated for their shortening with account of impact from lower temperature in the region, and anchor device is installed at larger angle than design angle. Value of design angle increase is set by linear value ΔZ over geometric centre of through pylon channel, for instance by electronic tachometre, according to the following equation: ΔZ = ΔH + subsidence, where ΔH - difference in height of fixation of upper guy parts with relative change of length in the range of temperature variation; subsidence - average value of subsidence according to report of geodesic measurements.
EFFECT: increased vibration strength and wear resistance of guy fixations with bridge span.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
MODE OF ADJUSTMENT OF MEASUREMENTS AT DETAIL STAKING WORKS ON HIGH INSTALLATION HORIZONS | 2004 |
|
RU2269095C2 |
COORDINATE POST-CONSTRUCTION SURVEY METHOD | 2004 |
|
RU2267745C1 |
METHOD OF ACCOMPLISHING LAYOUT WORK | 2000 |
|
RU2176778C1 |
METHOD TESTING VERTICALITY OF CASING TUBE | 1997 |
|
RU2144656C1 |
STRENGTHENING OF WATER-WAY STRUCTURES | 1999 |
|
RU2199622C2 |
SUSPENSION FOR SENSITIVE ELEMENTS | 1997 |
|
RU2138015C1 |
METHOD FOR DETERMINING THE TECHNICAL CONDITION OF REINFORCED CONCRETE BEAMS OF SUPERSTRUCTURES OF OPERATED MOTOR ROAD BRIDGES BY DEFLECTIONS THEREOF | 2020 |
|
RU2767165C2 |
EXPANSION JOINT | 2015 |
|
RU2596847C1 |
WELL CONSTRUCTION AND OPERATION METHOD | 2005 |
|
RU2320849C2 |
METHOD FOR SEISMIC EXPLORATION WHEN SEARCHING FOR HYDROCARBONS AND SEISMIC SYSTEM FOR REALISING SAID METHOD | 2010 |
|
RU2431868C1 |
Authors
Dates
2010-07-27—Published
2007-10-24—Filed