FIELD: oil production, particularly to flood formations and to keep formation pressure during oil field development.
SUBSTANCE: water conduit is provided with check valve at head zone of injection well having low intake capacity. The check valve directs water flow from water conduit to the well having low intake capacity. The check valve is surrounded with bypass in which filter and check valve are inserted. The bypass check valve directs flow from the well having low intake capacity to the filter. Bypass part between the check valve and the filter has contaminant removal pipeline.
EFFECT: reduced losses of intake well capacity, increased time between injection well bottom zone cleaning operations and, as a result, reduced costs of formation pressure keeping.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TREATING BOTTOM ZONE OF INJECTING WELLS | 2003 |
|
RU2244113C1 |
CLEANING METHOD FOR BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2006 |
|
RU2306405C1 |
METHOD FOR CLEANING FACE-ADJACENT ZONE OF BED OF FORCE WELL WITH WASHING OF TRANSFER WATER DUCT | 2005 |
|
RU2293175C1 |
INJECTION WELL HEAD TUBING | 2005 |
|
RU2300623C1 |
METHOD OF SIMULTANEOUS AND SEPARATE OPERATION OF INJECTION WELL | 2012 |
|
RU2488687C1 |
METHOD FOR CLEANING NEAR WELLBORE REGION OF INJECTION WELLS | 2007 |
|
RU2332557C1 |
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF A WELL | 2021 |
|
RU2775368C1 |
OIL FIELD DEVELOPMENT METHOD | 2006 |
|
RU2303126C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2302517C1 |
WATER-INTAKE CAPACITY BALANCING METHOD OF TWO WELLS | 2011 |
|
RU2440492C1 |
Authors
Dates
2006-02-10—Published
2004-07-16—Filed