FIELD: oil and gas industry.
SUBSTANCE: during balancing of water-intake capacity of two wells there chosen is a pair of wells with low water-intake capacity and high water-intake capacity; working medium is pumped to the well with low water-intake capacity, drained from the well and pumped to the well with high water-intake capacity. As working medium there used is water solution of surface-active substance with density of more than 1.17 g/cm3 and solvent of paraffin. After the working medium is pumped to the well with low water-intake capacity, process exposure takes place, and after the working medium is drained from the well with deposits removed from the well in the form of viscous emulsion, the viscous emulsion is pumped to the well with high water-intake capacity; geophysical investigations are performed on both wells and wells are put into operation.
EFFECT: increasing balancing efficiency of profile of the well water-intake capacity.
1 ex
Title | Year | Author | Number |
---|---|---|---|
CLEANING METHOD FOR BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2006 |
|
RU2306405C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2302517C1 |
METHOD FOR CLEANING FACE-ADJACENT ZONE OF BED OF FORCE WELL WITH WASHING OF TRANSFER WATER DUCT | 2005 |
|
RU2293175C1 |
OIL FIELD DEVELOPMENT METHOD | 2006 |
|
RU2303126C1 |
METHOD OF SIMULTANEOUS AND SEPARATE OPERATION OF INJECTION WELL | 2012 |
|
RU2488687C1 |
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF A WELL | 2021 |
|
RU2775368C1 |
METHOD FOR CLEANING NEAR WELLBORE REGION OF INJECTION WELLS | 2007 |
|
RU2332557C1 |
METHOD OF CLEANING OF NEAR WELLBORE REGION OF INJECTION WELLS | 2013 |
|
RU2537430C1 |
SYSTEM FOR FORMATION PRESSURE KEEPING | 2004 |
|
RU2269647C1 |
METHOD OF CLEANING BOTTOMHOLE ZONE OF FORMATION OF INJECTION WELL | 2015 |
|
RU2604891C1 |
Authors
Dates
2012-01-20—Published
2011-03-16—Filed