FIELD: mining industry, applicable in driving of horizontal workings.
SUBSTANCE: compensation and blast holes are drilled in a rock mass over the entire length of the raise. The blast holes are charges partially or completely, and they are subjected to a short-delay blasting into compensation holes and then the formed compensation cavities. The interval of slowing-down between the holes blasted in succession, depending on the detonation characteristics of the explosive, charge diameter, physico-technical properties of the rock mass, height and diameter of the newly formed compensation cavities should provide for breaking of the rock from the mass and full outburst of the rock mass from the cavity, i.e. to prevent the pressing effect of the rock mass in the contour of the raise.
EFFECT: determined the interval of slowing-down between the holes blasted in succession with prevention of the rock mass pressing in the contour of the raise, which allows to increase the height of the blasted section and enhance the physico-technical properties of the raise driving.
1 dwg, 1 ex, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DRIVING RAISES | 2016 |
|
RU2638992C2 |
METHOD FOR EXPLOSIVE DESTRUCTIONS OF ORE MASSIVES HAVING FRACTURED MESH STRUCTURE | 2002 |
|
RU2236590C2 |
METHOD OF BLASTING OF MINERAL RESOURCES | 1996 |
|
RU2107890C1 |
PILLARS DEMOLITION METHOD | 1991 |
|
RU2046941C1 |
METHOD OF WORKING DRIVING | 1996 |
|
RU2126133C1 |
METHOD OF BLASTING PRIMARY CHAMBER | 2011 |
|
RU2566354C2 |
METHOD OF SHOOTING OF ORE CAVITIES | 2014 |
|
RU2557274C1 |
METHOD FOR MAKING RAISE MINE WORKING | 0 |
|
SU1770571A1 |
METHOD OF PILLAR DESTRUCTION | 2008 |
|
RU2360117C1 |
METHOD OF DRIVING OF MINE WORKING | 1994 |
|
RU2097679C1 |
Authors
Dates
2006-03-10—Published
2003-11-28—Filed