FIELD: mining industry.
SUBSTANCE: during driving of cut drilling mines and during drilling of vertical wells geological documentation is formed on basis of which fractured mesh structure of ore massive is built, compensating chambers are formed inside separate structural block and shortly delayed wells or wells clusters detonation is performed in ore massive on compensating chambers and compressed environment with consideration of mineralized fractures location, while charge of explosive substance in wells is calculated dependently on position of well in massive, number of bare surfaces and volumes of outbreak funnel on basis of mathematical dependence considering height of extracted bed, specific loss of explosive substance on extraction dependent on physical-mechanical properties and fractures density in rock, theoretical and additional extraction areas for charge or group of charges of delay step limited by artificial and natural bare surfaces, while wells placed in central portion of block between compressed environment and compensating chambers are last to be exploded.
EFFECT: even and quality splitting up of rock massive.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE OF BLAST BREAKING OF ORE BLOCKS CLEAVED BY DIKE | 2001 |
|
RU2200298C2 |
METHOD OF BREAKING ORE BLOCKS COMPLICATED BY POST-R DIKE MAGMATISM | 2000 |
|
RU2191900C2 |
METHOD FOR EXTRACTING ORE BLOCKS, CUT BY SUBVERTICAL POST-ORE DIKE | 2003 |
|
RU2238408C1 |
METHOD OF SHOOTING OF ORE CAVITIES | 2014 |
|
RU2557274C1 |
METHOD FOR EXPLOSIVE BREAKAGE OF GRANITES WITH ENCLOSING DIKES | 1991 |
|
RU2021505C1 |
METHOD OF BLASTING PRIMARY CHAMBER | 2011 |
|
RU2566354C2 |
METHOD FOR CUTTING MINERALS AT SUBTERRANEAN CONDITIONS | 2002 |
|
RU2232892C2 |
METHOD FOR DRIVING OF RAISES WITH ROCK BREAKING BY DEEP-HOLE CHARGES | 2003 |
|
RU2271513C2 |
METHOD OF EXCAVATING SLOPING MINERAL DEPOSITS | 0 |
|
SU1460275A1 |
METHOD FOR PREVENTION OF ROCK BURSTS | 0 |
|
SU1689643A1 |
Authors
Dates
2004-09-20—Published
2002-04-29—Filed