FIELD: mining industry, in particular, working driving by blasting operations. SUBSTANCE: parallel single and two conjugated wells are drilled, these wells are charged by explosive by sections with installation of intrawell retarders between them, and initiation of explosive charges in sections of conjugated wells is accomplished with an advance by one section with respect to explosive charges in single wells, and explosive charges in wells are blasted in the direction of the formed compensation cavity. EFFECT: facilitated procedure. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DRIVING OF MINE WORKING | 1994 |
|
RU2097679C1 |
METHOD OF FORMATION OF PLANE EXPLOSIVE CHARGE | 1996 |
|
RU2114388C1 |
METHOD OF MINE WORKING DRIVING | 1999 |
|
RU2168636C2 |
PILLARS DEMOLITION METHOD | 1991 |
|
RU2046941C1 |
METHOD FOR DRIVING UNDERGROUND WORKING | 1993 |
|
RU2102601C1 |
METHOD OF ROCK MASS MINING BY BENCHES | 1992 |
|
RU2088759C1 |
PROCESS DRIVING RAISE | 2001 |
|
RU2203422C2 |
METHOD OF PREPARING BLOCK BOTTOM FOR CLEANUP JOB | 0 |
|
SU1737117A1 |
METHOD FOR MAKING RAISE MINE WORKING | 0 |
|
SU1770571A1 |
ORE BLOCK COMPLETION METHOD | 0 |
|
SU1765402A1 |
Authors
Dates
1999-02-10—Published
1996-05-27—Filed