FIELD: bridge building, particularly to launch continuous bridge span structures.
SUBSTANCE: method involves arranging launching beams to be connected one to another on bridge pier; welding supports adapted to prevent span structure displacement to launching beams so that the supports are arranged along the full length thereof; connecting slides having two walls in lower parts thereof to span structure to be launched, wherein each span structure is provided with at least two slides; securing pushing means to launching beams.
EFFECT: simplified technology and reduced structural costs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MOUNTING LARGE-SPAN COVERINGS WITH PUSHING FORCE | 2021 |
|
RU2789028C1 |
METHOD FOR INCREMENTAL LAUNCHING OF BRIDGE SPAN | 2009 |
|
RU2390601C1 |
METHOD FOR ASSEMBLING OVER-PIER PART OF BRIDGE SPAN STRUCTURE | 2003 |
|
RU2247805C2 |
PUSHING DEVICE TO LAUNCH BRIDGE SPANS | 2009 |
|
RU2421565C2 |
METHOD OF TELESCOPIC LONGITUDINAL SLIDING OF BRIDGE SUPERSTRUCTURE | 2010 |
|
RU2450100C1 |
DEVICE FOR BRIDGE SPAN STRUCTURE PROTRUSION | 2005 |
|
RU2297491C2 |
METHOD OF BRIDGE SUPERSTRUCTURE LONGITUDINAL LAUNCHING | 2006 |
|
RU2334042C2 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
DEVICE FOR SLIDING-ON STRUCTURE OF A BRIDGE | 0 |
|
SU863754A1 |
ARRANGEMENT FOR MOVING THE SPAN STRUCTURE OF A BRIDGE | 0 |
|
SU1152995A1 |
Authors
Dates
2006-04-10—Published
2004-05-17—Filed