FIELD: mining, particularly to develop production wells and to recover output from well having bore zone mudded with asphalt-tar-paraffin deposits and mechanical injuries.
SUBSTANCE: method involves lowering flow string in well and creating depression pressure drop between well bore zone and well interior by creating periodic pressure pulses in well bore zone, wherein the pressure pulses are generated as shock wave moving through well interior. The shock wave is created as a result of periodic well interior opening at well head to discharge pressurized well fluid into vessel due to preliminary fluid injection in well, as well as well head closing during well fluid movement. Lower flow string section is provided with profiled channel and hydroimpulsive device comprising hydropneumatic accumulator and valves to charge and discharge hydropneumatic accumulator. The valves for hydropneumatic accumulator filling are check valves, which are adapted to fill hydropneumatic accumulator chambers. The valves for hydropneumatic accumulator discharge are quick-response valves and are adapted to adjust opening threshold depending on pressure value and provide liquid displacement with compressed gas through profiled channel, which is directed for well boring. During well treatment lower end of flow string is moved along perforation height.
EFFECT: creation of substantial pressure pulses during deep well treatment and increased rate of standing wave attenuation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL BORE ZONE TREATMENT | 2004 |
|
RU2281390C1 |
WELL BORE ZONE TREATMENT METHOD | 2004 |
|
RU2276722C1 |
METHOD OF WELL FORMATION TREATMENT BY HYDRAULIC PULSE ACTION | 2023 |
|
RU2817366C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
METHOD OF COMPLEX WAVE ACTION ON WELL AND BOTTOM-HOLE ZONE | 2010 |
|
RU2459943C2 |
PROCESS OF TREATMENT OF CRITICAL AREA OF FORMATION | 2002 |
|
RU2219334C2 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF WELL, EQUIPPED WITH PACKER | 2007 |
|
RU2330952C1 |
METHOD AND DEVICE FOR REAGENT AND IMPULSE WELL AND PRODUCTIVE BED TREATMENT | 2005 |
|
RU2275495C1 |
METHOD OF TREATMENT OF WELL BOTTOMHOLE ZONE | 2007 |
|
RU2349747C1 |
PROCEDURE OF TREATMENT OF WELL BOTTOMHOLE ZONE | 2007 |
|
RU2355879C1 |
Authors
Dates
2006-05-20—Published
2004-10-14—Filed