SCREW PILE AND PILE CONSTRUCTION METHOD Russian patent published in 2006 - IPC E02D5/30 E02D5/56 

Abstract RU 2278211 C2

FIELD: building, particularly piles for foundation building.

SUBSTANCE: screw pile for soft ground comprises hollow shaft with helical extensions formed on outer shaft surface and extending at α angle to vertical line. The extensions are made of steel strip. The shaft is provided with connection pipes to supply filler in space between pile shaft and extensions to impart ellipsoid shape to the extensions. Tangent of α angle is equal to 0.15 - 0.70. Method of pile forming in soft ground involves producing hollow pile shaft with helical extensions; driving pile for predetermined design depth and imparting ellipsoid shape to the extensions after pile driving in ground by supplying filler in spaces between shaft and extensions; filling hollow pipe shaft with concrete.

EFFECT: increased load-bearing capacity and reduced labor inputs for pile production.

2 cl, 3 dwg

Similar patents RU2278211C2

Title Year Author Number
DRIVEN REINFORCED CONCRETE PILE FOR CHEMICAL FIXATION OF LOOSE SANDS AND METHOD TO FIX SOIL SURROUNDING PILE BODY 2011
  • Kocherzhenko Vladimir Vasil'Evich
  • Sokolov Nikolaj Georgievich
RU2492293C2
PILE 2004
  • Zemljanskij A.A.
  • Rashchepkina S.A.
  • Denisova A.P.
  • Vertynskij O.S.
RU2263746C1
EXTENDABLE SCREW PILE AND METHOD FOR ITS ARRANGEMENT 2021
  • Maltsev Nikolaj Sergeevich
  • Dobrynskij Andrej Vladimirovich
  • Chistyakov Dmitrij Yurevich
RU2769003C1
METHOD OF PILE PRODUCTION BY IMPRESSION 2013
  • Striganov Jurij Pavlovich
  • Striganov Ivan Jur'Evich
  • Striganov Mikhail Jur'Evich
RU2554368C2
WORKING MEMBER FOR DEVICE OF SCREW BORED PILES 2008
  • Ponomarenko Jurij Evgen'Evich
  • Baranov Nikita Bronislavovich
RU2385383C1
METHOD FOR CONSTRUCTING BORED PILE IN SOIL 2023
  • Frolov Vadim Eduardovich
  • Bondarevskij Aleksej Vladimirovich
  • Brovikov Yurij Nikolaevich
  • Kolesnikov Aleksej Yurevich
  • Bojkov Evgenij Vasilevich
RU2804651C1
PROCESS OF ERECTION OF PILE IN GROUND 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2208089C2
CONSTRUCTION METHOD OF PILE SCREW-BLADE FOUNDATION OF STRUCTURE, AND ITS ARRANGEMENT 2013
  • Khrustalev Evgenij Nikolaevich
RU2537463C1
BORED PILE AND METHOD FOR PILE ERECTION IN KARST OR SOFT GROUND 2004
  • Basiev Akhsar Nikolaevich
RU2270294C1
INJECTION PILE AND THE METHOD FOR ITS INSTALLATION 2021
  • Maltsev Nikolaj Sergeevich
  • Dobrynskij Andrej Vladimirovich
  • Chistyakov Dmitrij Yurevich
RU2771363C1

RU 2 278 211 C2

Authors

Zemljanskij Anatolij Andreevich

Rashchepkina Svetlana Alekseevna

Denisova Alla Pavlovna

Vertynskij Oleg Stanislavovich

Dates

2006-06-20Published

2003-09-29Filed