FIELD: building, particularly piles for foundation building.
SUBSTANCE: screw pile for soft ground comprises hollow shaft with helical extensions formed on outer shaft surface and extending at α angle to vertical line. The extensions are made of steel strip. The shaft is provided with connection pipes to supply filler in space between pile shaft and extensions to impart ellipsoid shape to the extensions. Tangent of α angle is equal to 0.15 - 0.70. Method of pile forming in soft ground involves producing hollow pile shaft with helical extensions; driving pile for predetermined design depth and imparting ellipsoid shape to the extensions after pile driving in ground by supplying filler in spaces between shaft and extensions; filling hollow pipe shaft with concrete.
EFFECT: increased load-bearing capacity and reduced labor inputs for pile production.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DRIVEN REINFORCED CONCRETE PILE FOR CHEMICAL FIXATION OF LOOSE SANDS AND METHOD TO FIX SOIL SURROUNDING PILE BODY | 2011 |
|
RU2492293C2 |
PILE | 2004 |
|
RU2263746C1 |
EXTENDABLE SCREW PILE AND METHOD FOR ITS ARRANGEMENT | 2021 |
|
RU2769003C1 |
METHOD OF PILE PRODUCTION BY IMPRESSION | 2013 |
|
RU2554368C2 |
WORKING MEMBER FOR DEVICE OF SCREW BORED PILES | 2008 |
|
RU2385383C1 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208089C2 |
CONSTRUCTION METHOD OF PILE SCREW-BLADE FOUNDATION OF STRUCTURE, AND ITS ARRANGEMENT | 2013 |
|
RU2537463C1 |
BORED PILE AND METHOD FOR PILE ERECTION IN KARST OR SOFT GROUND | 2004 |
|
RU2270294C1 |
INJECTION PILE AND THE METHOD FOR ITS INSTALLATION | 2021 |
|
RU2771363C1 |
Authors
Dates
2006-06-20—Published
2003-09-29—Filed