PROCESS OF ERECTION OF PILE IN GROUND Russian patent published in 2003 - IPC

Abstract RU 2208089 C2

FIELD: construction industry, pile foundations, in particular. SUBSTANCE: invention refers mainly to erection of pile in ground under complicated hydrological conditions. Process consists in that hollow body of revolution coming in the form of tube or monolithic with loosening tip in lower part and helical coiling on outside surface is sunk into ground up to design reference mark. Then tube is unscrewed to day surface by reverse rotation with simultaneous feed of hardening material into space of hole. Novelty of process lies in that walls of hole are compacted thanks to displacement of removed ground towards wall of hole and pile is sunk into ground owing to simultaneous rotation and pressing into ground under action of external force or under own weight of body of revolution with helical coiling which section over length of tube is constant and equal to 0.02-0.1 diameter of tube over its outer surface. Then hardening and/or antifiltration material is fed into mouth of formed hole with inserted body of revolution between turns of helical coiling and body of revolution is unscrewed thanks to reverse rotation for compaction of ground wall of hole in zone of foot and side wall of hole by way of ramming with hardening and/or antifiltration material with simultaneous filling of space of hole with mentioned material supplied in process of unscrewing along outer surface of body of revolution. EFFECT: raised carrying capacity of pile thanks to provision for its position stability in ground ensured by increased rigid properties of hole wall, possibility of installation of pile foundation in crowded town conditions in loose or flooded ground. 1 cl

Similar patents RU2208089C2

Title Year Author Number
PROCESS OF ERECTION OF GUARDING ANTIFILTRATION ENGINEERINGPRTECTIVE STRUCTURE 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2206663C1
TECHNIQUE TO ERECT ANTIFILTRATION ENGINEERING-PROTECTIVE STRUCTURE 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2211283C1
PROCESS OF ERECTION OF PILE IN GROUND 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2208088C2
PILE 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2204653C2
BORED PILE AND METHOD FOR PILE ERECTION IN KARST OR SOFT GROUND 2004
  • Basiev Akhsar Nikolaevich
RU2270294C1
METHOD FOR CONCRETE PILE SHOE FORMING 2004
  • Basiev Akhsar Nikolaevich
RU2276227C1
PILE AND METHOD OF ITS ERECTION 2013
  • Veselov Aleksandr Vasil'Evich
  • Kirzhaeva Alena Igorevna
RU2528331C1
METHOD FOR CONSTRUCTING BORED PILE IN SOIL 2023
  • Frolov Vadim Eduardovich
  • Bondarevskij Aleksej Vladimirovich
  • Brovikov Yurij Nikolaevich
  • Kolesnikov Aleksej Yurevich
  • Bojkov Evgenij Vasilevich
RU2804651C1
METHOD FOR SHEET-PILE ENCLOSURE OR RETAINING WALL FORMING WITH GROUND WATER FLOW CONTROL 2004
  • Basiev Akhsar Nikolaevich
RU2283921C2
PROCESS OF DEEP COMPACTION OF SOIL 1997
  • Basiev A.N.
  • Mariupol'Skij L.G.
RU2141020C1

RU 2 208 089 C2

Authors

Basiev A.N.

Zelov M.V.

Ikusov A.G.

Dates

2003-07-10Published

2001-08-28Filed