FIELD: oil production industry, particularly methods to prevent pipe freezing in water injection well head.
SUBSTANCE: method involves injecting oil in well for water displacement to zone having positive ground temperature via pipes after scheduled stoppage of water supply into pipes and fittings of well head; draining oil from well head pipes and accumulating oil in reserve vessel before repeated water injection operation beginning so that the oil may be reused during following scheduled stoppage of water-supply.
EFFECT: increased efficiency of well head freezing prevention during scheduled stoppage of water-supply in cyclic water-flooding regime.
1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE PREVENTING FREEZING OF WELL-HEAD OF WATER- INJECTION WELLS UNDER CONDITION OF CYCLIC FLOODING | 1999 |
|
RU2160824C2 |
EQUIPMENT OF WATER-INJECTION WELL MOUTH | 2001 |
|
RU2213205C2 |
METHOD OF FREEZING PREVENTION OF WATER-INJECTION WELL MOUTH | 2002 |
|
RU2213846C1 |
FREEZING CONTROL METHOD OF WELLHEAD EQUIPMENT OF WATER-INJECTION WALL, AND VALVE FOR ITS IMPLEMENTATION | 2010 |
|
RU2438005C1 |
METHOD FOR PROTECTING HEAD OF INJECTION WELL AGAINST FREEZING | 2011 |
|
RU2483198C1 |
METHOD OF PREVENTION OF FREEZING OF INJECTION WELL HEAD | 2001 |
|
RU2209933C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2530948C1 |
INJECTION WELL HEAD TUBING | 2005 |
|
RU2300623C1 |
SYSTEM OF CLUSTER WATER PUMPING TO FORMATION | 2012 |
|
RU2494238C1 |
PROCEDURE FOR PREVENTION OF WELLHEAD FREEZING IN PRESSURE WELL | 2010 |
|
RU2420655C1 |
Authors
Dates
2006-06-27—Published
2004-04-28—Filed