FIELD: oil and gas production.
SUBSTANCE: here is disclosed procedure for prevention of wellhead freezing in pressure well. The pressure well is equipped with a production string (PS). The PS is communicated with an above-ground water conduit to pump fluid via shut-off accessories and to drain fluid from the water conduit into the well when pumping is terminated. The procedure consists in pumping fluid through shut-off accessories corresponding to a spring-loaded valve under pressure exceeding force, opening the spring-loaded valve through an above-ground part of the water conduit. From the side of the well this part is equipped with a pipeline at the spring-loaded valve, and it is equipped with a float valve on the other side from the valve in an upper point. Also, fluid is drained in the PS from the under-ground part of the water conduit below the level of seasonal frost penetration into ground via the pipeline on above-ground part of the water conduit after float valve opens at excess of pressure drop between the water conduit and environment. This pressure drop is created with fluid flowing into a reservoir, when well stops, and it holds the float valve.
EFFECT: reliable prevention of wellhead freezing at durable stops of well operation; reduced material and labour expenditures at implementation of this procedure.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREVENTION OF FREEZING OF INJECTION WELL HEAD | 2001 |
|
RU2209933C1 |
DEVICE TO PREVENT FREEZING OF PRODUCING WELL HEAD | 1995 |
|
RU2101467C1 |
METHOD OF TIGHTNESS TESTING OF INJECTION WELL | 2013 |
|
RU2551038C2 |
METHOD AND DEVICE FOR PREVENTING FREEZING OF INJECTION WELL HEAD | 1995 |
|
RU2092676C1 |
METHOD OF PREVENTION OF WELLHEAD FREEZING OF OIL AND INJECTION WELLS | 2001 |
|
RU2208133C2 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
DEVICE FOR INJECTION OF FLUID INTO BED | 2013 |
|
RU2539504C1 |
METHOD FOR PREPARING WATER FOR FEEDING INTO FORCE WELLS | 2003 |
|
RU2239698C1 |
INJECTION WELL HEAD TUBING | 2005 |
|
RU2300623C1 |
METHOD FOR DETERMINING TUBING TIGHTNESS IN INJECTION WELLS | 2018 |
|
RU2693090C1 |
Authors
Dates
2011-06-10—Published
2010-02-16—Filed