FIELD: production of liquid and gaseous media from wells, particularly to treat oil production and injection well bottom zones.
SUBSTANCE: method involves delivering hydrochloric acid solution to well bottom zone by forcing thereof with oil; forming hydrochloric acid solution bath at well head; forcing hydrochloric acid solution into bottom zone; performing swabbing operation via flow string without exercising technological time-delay for acid reaction conduction; delivering hydrofluoric solution to bottom zone, wherein hydrofluoric solution includes mixture of hydrochloric and hydrofluoric acids, as well as surfactant additive; carrying out technological time-delay for 1-2 hours; performing swabbing operation via flow string to reach design well deliverability.
EFFECT: increased efficiency of bottomhole zone treatment.
1 ex
| Title | Year | Author | Number | 
|---|---|---|---|
| PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL | 2009 | 
 | RU2398960C1 | 
| METHOD FOR BOTTOMHOLE ZONE TREATMENT | 2012 | 
 | RU2512222C1 | 
| DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 | 
 | RU2506421C1 | 
| DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 | 
 | RU2506422C1 | 
| METHOD FOR COMPLETING AND INTENSIFYING INFLOW OF WELL WITH CARBONATE RESERVOIRS | 2020 | 
 | RU2750004C1 | 
| METHOD OF MULTIHOLE WELL CONSTRUCTION | 2009 | 
 | RU2376438C1 | 
| METHOD OF WELL OPERATION | 2007 | 
 | RU2335622C1 | 
| METHOD OF WELL BOTTOM ZONE PROCESSING | 2013 | 
 | RU2531771C1 | 
| WELL BOTTOM ZONE TREATMENT METHOD | 2005 | 
 | RU2280154C1 | 
| WELL COMPLETION METHOD | 2018 | 
 | RU2695908C1 | 
Authors
Dates
2006-06-27—Published
2005-07-25—Filed