FIELD: oil industry, particularly methods for stimulating production.
SUBSTANCE: method involves forcing solution of acid and surfactant in productive formation zone; exercising technological time-delay and providing differential pressure drawdown. The solution is obtained by solving surfactant, namely chromium acetate-based surfactant, heated up to 80-90°C and highly concentrated hydrochloric acid in distillated water to reduce hydrochloric acid concentration up to 5-20%. The solution is injected at temperature of 30-70°C. Volume of the solution is enough to heat flow string to temperature providing mudding member melting, that is not less than 0.8 m3/m of productive formation. The solution if formed by light-weight oil having flow rate of 24-35 m3/day under initial pressure of 0.8-1.5 MPa at flow string head. The time delay is carried out for not more than 2 hours. Differential pressure drawdown is performed by swabbing operation when hole annuity is packed to obtain well bottom pressure drawdown of not less than 3 MPa.
EFFECT: increased efficiency of well bottom zone treatment.
1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL | 2009 |
|
RU2398960C1 |
WELL BOTTOM ZONE TREATMENT METHOD | 2005 |
|
RU2268360C1 |
WELL BOTTOM ZONE TREATMENT METHOD | 2004 |
|
RU2266405C1 |
WELL SWABBING METHOD | 2010 |
|
RU2410532C1 |
METHOD OF WELL BOTTOM ZONE PROCESSING | 2013 |
|
RU2531771C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF PRESSURE WELL | 2010 |
|
RU2416024C1 |
METHOD FOR BOTTOMHOLE ZONE OF TERRIGENOUS FORMATION TREATMENT | 2005 |
|
RU2278967C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
METHOD FOR HORIZONTAL WELL BOTTOM ZONE INTERVAL TREATMENT | 2005 |
|
RU2278966C1 |
METHOD FOR HORIZONTAL WELL BOTTOM ZONE INTERVAL TREATMENT | 2007 |
|
RU2318999C1 |
Authors
Dates
2006-07-20—Published
2005-06-15—Filed