FIELD: building, particularly to reinforce existent load-bearing structures of building coverings and floors.
SUBSTANCE: method involves connecting reinforcing subdiagonal to the beam; installing temporary subdiagonal; tightening tie-bars and demounting temporary subdiagonal. The temporary subdiagonal is installed over beam so that subdiagonal posts are arranged between posts of temporary subdiagonal. Tie-bas passes through curvilinear guiding means mounted at beam supports and is connected to subdiagonal tie-bar by means of flexible clips. After that tie-bars are tightened and subdiagonal tie-bar is fixed in beam supports.
EFFECT: reduced labor inputs and simplified beam reinforcement.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
WAY OF REINFORCEMENT OF BEAM BY PRE-STRESSED STRUT FRAME | 2001 |
|
RU2187608C1 |
PROCESS OF MOUNTING OF PRESTRESSED STRUTFRAMED BEAM | 2002 |
|
RU2208104C1 |
PROCESS OF MOUNTING OF PRESTRESSED STRUTTED UNIT OF COVERING | 2002 |
|
RU2208103C1 |
PROCESS OF STRENGTHENING OF REINFORCED CONCRETE BEAM WITH STRUT FRAME | 2002 |
|
RU2208105C1 |
PROCESS OF REINFORCEMENT OF BEAM WITH PRESTRESSED STRUT FRAME | 2002 |
|
RU2209278C1 |
METHOD FOR COMBINATION PRESTRESSING OF PERFORATED TRUSSED BEAM | 2001 |
|
RU2190735C1 |
TRUSSED BEAM | 1999 |
|
RU2169242C1 |
PRESTRESSED TRUSSED BEAM | 2001 |
|
RU2186913C1 |
TRUSSED GIRDER | 2017 |
|
RU2668624C1 |
PRESTRESSED TRUSSED GIRDER | 2001 |
|
RU2186914C1 |
Authors
Dates
2006-07-20—Published
2005-02-07—Filed