FIELD: survey of boreholes or wells, particularly gas well operation control.
SUBSTANCE: signaling device is made as vertical pipe installed in gas pipeline (gathering line or gas well manifold). Upper pipe part has orifices arranged from approach flow side, lower part thereof extends from gas pipeline and provided with ball shutoff valve. Feed pipe is secured from another tap side. The feed pipe is provided with netted flap secured to the pipe and provided with drive linked to two-position regulator along with signaling means, namely lamp or light-emitting diode. Regulator input is connected to pressure drop sensor.
EFFECT: increased reliability and reduced time of information obtaining.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND INSTALLATION FOR FLOW RATE MEASUREMENT OF PRODUCTS FROM GAS-CONDENSATE AND OIL WELLS | 2013 |
|
RU2532490C1 |
UNIT FOR MEASURING PRODUCTION RATES OF GAS CONDENSATE AND OIL WELLS AND METHOD FOR ITS OPERATION | 2022 |
|
RU2799684C1 |
ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE | 2021 |
|
RU2762323C1 |
METHOD OF ON-LINE MONITORING OF WATER AND SAND CARRY-OVER WITH EXTRACTED PRODUCT FROM WELL IN APCS OF GAS-FIELD SITES OF OIL AND GAS CONDENSATE DEPOSITS OF FAR NORTH | 2011 |
|
RU2474685C2 |
MOBILE INSTALLATION FOR WELL RESEARCH AND COMPLETION | 2016 |
|
RU2675815C2 |
METHOD OF ON-LINE MONITORING OF WATER AND SAND CARRY-OVER WITH PRODUCT EXTRACTED FROM WELL IN APCS OF GAS-FIELD SITES OF OIL AND GAS CONDENSATE DEPOSITS OF FAR NORTH | 2015 |
|
RU2619602C1 |
OPERATING METHOD OF WELLS AND GAS COLLECTION SYSTEM DURING COMPRESSOR PERIOD OF DEVELOPING GAS AND GAS CONDENSATE FIELDS | 2007 |
|
RU2346147C1 |
METHOD FOR GAS CONDENSATE INVESTIGATION OF WELLS | 2022 |
|
RU2784672C1 |
UNIT AND METHOD OF STUDY OF GAS AND GAS CONDENSATE WELLS | 2014 |
|
RU2575288C2 |
METHOD AND INSTALLATION FOR MEASURING LIQUID AND GAS COMPONENTS OF OIL, GAS AND GAS-CONDENSATE WELLS | 2017 |
|
RU2671013C1 |
Authors
Dates
2006-07-20—Published
2005-01-27—Filed