FIELD: mining industry.
SUBSTANCE: invention relates to repairing holes. The composition for insulation of deposit waters inflow interval comprises polyurethane, solvent and the polymerization process regulating agent wherein it comprises "Component Poroplast plus A-3017B" as polyurethane, "Polyester SG-500" as a solvent and electrolyte aqueous solution with the content of salts 300-350 g/l, not less, as the polymerization process regulating agent in the following ratio of components, wt.-%: "Component Poroplast plus A-3017B", 70-95; "Polyester SG-500, 5-30, and indicated electrolyte aqueous solution, 5-15 above 100%. Invention provides enhancing quality of insulation of deposit waters inflow interval in the hole, accelerating process of its preparing and pumping in the composition.
EFFECT: valuable technical properties of composition.
4 tbl
Title | Year | Author | Number |
---|---|---|---|
POLYMERIC COMPOSITION FOR ISOLATING AND STRENGTHENING ROCK | 2016 |
|
RU2641553C1 |
METHOD FOR EFFECTING FACE-ADJACENT WELL AREA | 2004 |
|
RU2252311C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
TWO-COMPONENT POLYURETHANE COMPOUND FOR SEALING AND STRENGTHENING WET ROCK | 2022 |
|
RU2803091C1 |
SELECTIVE COMPOSITION FOR REPAIR AND ISOLATION IN OIL AND GAS WELLS | 2013 |
|
RU2529080C1 |
PROCESS OF SECONDARY OPENING OF PRODUCTIVE POOL AND GEAR FOR ITS IMPLEMENTATION | 1993 |
|
RU2057909C1 |
METHOD FOR TEMPORARY PRODUCTIVE RESERVOIR INTERVAL PLUGGING | 2005 |
|
RU2306414C2 |
METHOD FOR ISOLATION OF WATER INFLUX, GAS INFLUX OR LOST CIRCULATION ZONES | 2002 |
|
RU2228437C2 |
WATER INFLOW SHUT-OFF COMPOSITION FOR OIL AND GAS WELLS | 2005 |
|
RU2301246C2 |
METHOD OF SHUT-OFF AND RESTRAINT OF WATER PRODUCTION IN WELLS | 2007 |
|
RU2349731C2 |
Authors
Dates
2006-08-27—Published
2005-02-21—Filed