FIELD: mechanical engineering; gas-turbine plants.
SUBSTANCE: according to proposed method of boosting of gas-turbine plant water is delivered inside axial-flow compressor. Water is fed into inner space of rotor (drum) of axial-flow compressor with compression ratio not less than 15, and into heat exchanger arranged in compressor stator housing in amount not less than 3% of air flow through compressor. Steam formed in drum and heat exchanger is directed into gas-air duct of gas-turbine plant.
EFFECT: increased effective efficiency of gas-turbine plant.
6 cl, 7 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| STEAM-TURBINE ENGINE | 2005 | 
 | RU2285131C1 | 
| POWER PLANT | 2005 | 
 | RU2287708C1 | 
| GAS TURBINE PLANT OUTPUT CONTROL METHOD | 2006 | 
 | RU2330977C1 | 
| METHOD OF FORCING GAS TURBINE PLANT | 2018 | 
 | RU2674089C1 | 
| STEAM-GAS TURBINE PLANT | 2004 | 
 | RU2272916C2 | 
| METHOD TO AUGMENT AIRCRAFT ENGINE | 2009 | 
 | RU2386832C1 | 
| GAS-TURBINE ENGINE WITH TURBOCOOLER AT INLET | 2003 | 
 | RU2239080C1 | 
| GAS TURBINE ENGINE BOOSTING METHOD | 2001 | 
 | RU2193099C2 | 
| TURBOJET ENGINE WITH EJECTOR SUPERCHARGING | 2001 | 
 | RU2201518C2 | 
| COMBINED CYCLE PLANT | 2012 | 
 | RU2520762C1 | 
Authors
Dates
2006-09-27—Published
2005-04-01—Filed