FIELD: oil industry, in particular, methods for bed isolation during well borehole fortification.
SUBSTANCE: expanding pipe is lowered into fortification interval. Pipe is rectified by means of creating excessive pressure in it. In accordance to invention, in hollows of recesses of profiled portion of expanding pipe hermetic chambers are formed with radius of external cover equal to radius of circle circumscribed around expanding pipe. Quick-freezing expanding backfill compound is forced into chambers, capable of hardening during interaction with well liquid.
EFFECT: increased bed isolation quality.
2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR CLOSURE OF BOREHOLE INTERVALS | 2010 |
|
RU2422617C1 |
DEVICE FOR OPEN HOLE DIVISION INTO SEPARATE SECTIONS | 2012 |
|
RU2487231C1 |
METHOD OF DRILLING EXTRA BORE FROM WELL PRODUCTION STRING | 2011 |
|
RU2463433C1 |
PROCESS OF TERMINATION OF CONSTRUCTION OF WELLS AND GEAR FOR ITS IMPLEMENTATION | 2000 |
|
RU2165516C1 |
METHOD FOR INCREASING TIGHTNESS OF ANNULAR SPACE OF OIL AND GAS WELLS (OPTIONS) | 2021 |
|
RU2775849C1 |
DEVICE FOR SEGREGATION OF FORMATIONS OR PRODUCTIVE STRATUM OF HORIZONTAL WELL INTO SEPARATE AREAS | 2012 |
|
RU2495226C1 |
DRILLING METHOD OF ADDITIONAL BORE FROM PRODUCTION STRING OF WELL | 2008 |
|
RU2365728C1 |
METHOD FOR ELIMINATION OF FLUID CROSSFLOWS IN A WELL | 2018 |
|
RU2702455C1 |
DEVICE FOR SEGREGATION OF OPEN HOLE OF HORIZONTAL WELL INTO SEPARATE SECTIONS | 2015 |
|
RU2595123C1 |
METHOD FOR COMPLETION OF WELL CONSTRUCTION | 0 |
|
SU1639120A1 |
Authors
Dates
2006-11-27—Published
2005-04-04—Filed